PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, January 29, 2009
.
Number of inspections:
20
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC08-00875
Random Inspection
1/29/2009
1/29/2009
1/29/2009 4:07:54 PM
P
PASS
All issues taken care of.
ESC08-00658
General Inspection
1/29/2009
1/29/2009
1/29/2009 3:45:13 PM
A
FAIL
Verbal correction to RP:
Told RP that additional wattle plus the replacement of wattle already inplace needs to occur at the left side of drive way where it is over a 2% grade slope. Will re-inspect on 2/2/09.
ESC09-00010
General Inspection
1/29/2009
1/29/2009
1/29/2009 3:30:59 PM
A
FAIL
see prior inspection.
ESC08-00585
General Inspection
1/29/2009
1/29/2009
1/29/2009 1:32:29 PM
PASS
ESC07-01364
Site Final
1/29/2009
1/29/2009
1/29/2009 11:44:11 AM
P
PASS
ESC06-00705
Site Final
1/29/2009
1/29/2009
1/29/2009 11:37:28 AM
P
PASS
ESC07-00233
Site Final
1/29/2009
1/29/2009
1/29/2009 11:35:06 AM
P
PASS
ESC05-01414
Site Final
1/29/2009
1/29/2009
1/29/2009 10:53:02 AM
A
PASS
ESC09-00026
Site Preparation
1/29/2009
1/29/2009
1/29/2009 10:50:01 AM
A
PASS
ESC08-00888
BMP Violation
1/27/2009
1/29/2009
1/29/2009 10:49:08 AM
A
PASS
All issues taken care of.
ESC08-00886
BMP Violation
1/27/2009
1/29/2009
1/29/2009 10:48:58 AM
A
PASS
All issues taken care of.
ESC08-00885
BMP Violation
1/27/2009
1/29/2009
1/29/2009 10:48:39 AM
A
PASS
All issues taken care of.
ESC08-00706
BMP Violation
1/27/2009
1/29/2009
1/29/2009 10:45:17 AM
A
PART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Will input if pertaining to a single lot though.
ESC08-00899
BMP Violation
1/27/2009
1/29/2009
1/29/2009 10:44:49 AM
A
PART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00900
BMP Violation
1/27/2009
1/29/2009
1/29/2009 10:44:36 AM
A
PART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00901
BMP Violation
1/27/2009
1/29/2009
1/29/2009 10:44:18 AM
A
PART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00889
BMP Violation
1/27/2009
1/29/2009
1/29/2009 10:44:06 AM
A
PART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00890
BMP Violation
1/27/2009
1/29/2009
1/29/2009 10:43:55 AM
A
PART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00892
BMP Violation
1/27/2009
1/29/2009
1/29/2009 10:43:43 AM
A
PART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00894
BMP Violation
1/27/2009
1/29/2009
1/29/2009 10:43:24 AM
A
PART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.