Inspections for the day of: Thursday, January 29, 2009.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00875 Random Inspection1/29/20091/29/20091/29/2009 4:07:54 PMPPASS
All issues taken care of.
ESC08-00658 General Inspection1/29/20091/29/20091/29/2009 3:45:13 PMAFAIL
Verbal correction to RP:
Told RP that additional wattle plus the replacement of wattle already inplace needs to occur at the left side of drive way where it is over a 2% grade slope. Will re-inspect on 2/2/09.
ESC09-00010 General Inspection1/29/20091/29/20091/29/2009 3:30:59 PMAFAIL
see prior inspection.
ESC08-00585 General Inspection1/29/20091/29/20091/29/2009 1:32:29 PM PASS
ESC07-01364 Site Final1/29/20091/29/20091/29/2009 11:44:11 AMPPASS
ESC06-00705 Site Final1/29/20091/29/20091/29/2009 11:37:28 AMPPASS
ESC07-00233 Site Final1/29/20091/29/20091/29/2009 11:35:06 AMPPASS
ESC05-01414 Site Final1/29/20091/29/20091/29/2009 10:53:02 AMAPASS
ESC09-00026 Site Preparation1/29/20091/29/20091/29/2009 10:50:01 AMAPASS
ESC08-00888 BMP Violation1/27/20091/29/20091/29/2009 10:49:08 AMAPASS
All issues taken care of.
ESC08-00886 BMP Violation1/27/20091/29/20091/29/2009 10:48:58 AMAPASS
All issues taken care of.
ESC08-00885 BMP Violation1/27/20091/29/20091/29/2009 10:48:39 AMAPASS
All issues taken care of.
ESC08-00706 BMP Violation1/27/20091/29/20091/29/2009 10:45:17 AMAPART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Will input if pertaining to a single lot though.
ESC08-00899 BMP Violation1/27/20091/29/20091/29/2009 10:44:49 AMAPART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00900 BMP Violation1/27/20091/29/20091/29/2009 10:44:36 AMAPART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00901 BMP Violation1/27/20091/29/20091/29/2009 10:44:18 AMAPART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00889 BMP Violation1/27/20091/29/20091/29/2009 10:44:06 AMAPART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00890 BMP Violation1/27/20091/29/20091/29/2009 10:43:55 AMAPART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00892 BMP Violation1/27/20091/29/20091/29/2009 10:43:43 AMAPART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.
ESC08-00894 BMP Violation1/27/20091/29/20091/29/2009 10:43:24 AMAPART
Verbal to RP:
They are in the process of backfill trenches and removing the stock piles. Activily placing exteral protection on storm drains and maintain all protection on all of them through the construction project area. Told RP to clean up all sediment and debris off of all hard surfaces at the end of the work day or if it gets to excessive. Will re-inspect the sud-division 2/2/09. Refer to ESC08-00706. Will input if pertaining to a single lot though.