FIR09-00675
| INSP-Final Inspection | 1/22/2010 | 1/25/2010 | | A | |
|
|
trent Phone #: ###-####
|
FIR09-00642
| INSP-Sprinkler Rough-in | 1/29/2010 | 1/29/2010 | 2/1/2010 4:29:43 PM | P | PART |
|
|
Inspection for the new wet riser, DCVA, and UG riser okayed with the exception of insufficient clearance provision where the riser stub will meet the new floor slab- to be done prior to pour as discussed.
|
BLD09-00378
| FIRE-Final Inspection | 1/29/2010 | 1/29/2010 | 1/29/2010 2:44:50 PM | P | PASS |
|
|
Fire life safety passed, ceiling tile to be replaced prior to structural final.
|
FIR09-00652
| INSP-Final Inspection | 1/29/2010 | 1/29/2010 | 1/29/2010 2:37:32 PM | P | PASS |
|
|
Fire alarm system modifications tested satisfactory, permit final approved.
|
FIR09-00612
| INSP-Supply line flush | 1/28/2010 | 1/29/2010 | 1/29/2010 11:39:16 AM | A | PART |
|
|
Supply line flush completed acceptable.
|
BLD09-02214
| FIRE-Final Inspection | 1/27/2010 | 1/29/2010 | 1/29/2010 11:38:25 AM | A | PASS |
|
|
Life safety inspection passed.
|
BLD09-02248
| FIRE-Final Inspection | 1/28/2010 | 1/29/2010 | 1/29/2010 11:37:31 AM | A | FAIL |
|
|
Modifications per the scope of remodel work have resulted in fire sprinkler system deficiencies including one new room lacking coverage and overspacing at the west side of the tenant space. See plan review annotations and fire code review notes for details. Remainder of fire life safety appears okay.
|