BLD12-00932
| BLD-Conference | 1/28/2013 | 1/29/2013 | 1/30/2013 6:58:11 AM | A | PART |
|
|
6th floor exterior framing, 3rd and 4th floor interior framing. Phone #: ###-#### >> Inspection requested via web by Adam Johnson all framing is ok but still needs other trades rough ins
|
BLD12-01330
| BLD-Concrete | 1/29/2013 | 1/29/2013 | 1/30/2013 6:56:34 AM | A | CANC |
|
|
|
BLD13-00084
| BLD-Final | 1/28/2013 | 1/29/2013 | 1/30/2013 6:55:50 AM | P | NR |
|
|
Chad Phone #: ###-####
|
BLD12-02009
| BLD-Conference | 1/28/2013 | 1/29/2013 | 1/30/2013 6:55:05 AM | P | PASS |
|
|
Rough Framing Inspection for Window Cut out in Kitchen to Activity Room. Call Brian ###-#### Phone #: ###-#### >> Inspection requested via web by Brian McCoy
|
BLD12-03292
| BLD-Footing | 1/29/2013 | 1/29/2013 | 1/30/2013 6:54:47 AM | P | NR |
|
|
Chris Phone #: ###-####
|
BLD12-03245
| BLD-Footing | 1/29/2013 | 1/29/2013 | 1/30/2013 6:54:30 AM | P | NR |
|
|
Chris Phone #: ###-####
|
BLD12-02933
| BLD-Energy code compliance | 1/29/2013 | 1/29/2013 | 1/29/2013 12:54:35 PM | P | PASS |
|
|
rollo Phone #: ###-####
|
BLD12-02998
| BLD-Framing/Rough-in | 1/29/2013 | 1/29/2013 | 1/29/2013 12:42:49 PM | P | PART |
|
|
john Phone #: ###-#### c/n on site ok to insulate
|