FIR14-00851
| INSP-Alarm Testing | 1/28/2015 | 1/29/2015 | 1/29/2015 4:22:16 PM | P | DONE |
|
|
Completed testing of the new in duct detectors, verified signals, noted in ducts are programmed as an alarm signal.
|
BLD14-02919
| FIRE-Final Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 4:15:57 PM | P | PASS |
|
|
Delayed egress hardware removed, corrections verified. Fire life safety passed.
|
BLD14-03096
| FIRE-Final Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 4:14:28 PM | P | PASS |
|
|
Verified C/N items. Fire life safety finaled.
|
BLD15-00133
| FIRE-Final Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 4:13:46 PM | P | FAIL |
|
|
Final pending panic hardware per plan review annotations as noted- NW door to exit stairway.
|
FIR14-00708
| INSP-Sprinkler Rough-in | 1/28/2015 | 1/29/2015 | 1/29/2015 12:48:42 PM | A | PART |
|
|
Rough-in inspection completed for the 1st floor area E living units. Record drawings provided to match field work and retained to verify with plan resubmittal as previously agreed.
|
BLD15-00194
| FIRE-Final Inspection | 1/27/2015 | 1/29/2015 | 1/29/2015 12:43:15 PM | A | PASS |
|
|
Life safety inspection passed provided EM light at the hallway is repaired prior to structural final as agreed.
|
FIR14-00430
| INSP-Sprinkler Rough-in | 1/28/2015 | 1/29/2015 | 1/29/2015 12:41:50 PM | A | PART |
|
|
Inspection for concealed space coverage and pendent head drops installed to date at tower 2 5th floor pods only- Soffits not yet built
|