ELE18-04002
| Electrical Rough-In | 1/29/2019 | 1/29/2019 | 1/29/2019 2:50:02 PM | P | PASS |
|
|
Please call - if I am not onsite, I will be 5 minutes away. Phone #: ###-#### Inspection requested via web by Mollie Carroll... rough ok...circuits needed fished in, new lighting and switches fished in discussed new micro circuit
|
ELE19-00308
| Final | 1/29/2019 | 1/29/2019 | 1/29/2019 2:07:28 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Calvin Bohrer... not ready at this time will schedule once power restored
|
ELE19-00308
| Permanent Service | 1/29/2019 | 1/29/2019 | 1/29/2019 2:06:50 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Calvin Bohrer... p/s o/h reconnect ok
|
ELE19-00328
| Temporary Service | 1/29/2019 | 1/29/2019 | 1/29/2019 1:27:09 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... t/s u/g new ok
|
ELE18-04746
| Electrical Rough-In | 1/28/2019 | 1/29/2019 | 1/29/2019 12:23:41 PM | P | PASS |
|
|
Ceiling RI around noon if possible. Phone #: ###-#### Inspection requested via web by Kerri Hamilton.... grid as marked on plans requiring one disconnect moved in back office.. disconnect is not accesible, arm cannot function because of location and new ceiling grid install
|
ELE19-00364
| Temporary Service | 1/29/2019 | 1/29/2019 | 1/29/2019 11:57:45 AM | P | PASS |
|
|
The temp pole is in north west corner of lot. Overhead pole Phone #: ###-#### Inspection requested via web by Kevin Heideman... t/s o/h new ok
|
ELE19-00319
| Final | 1/25/2019 | 1/29/2019 | 1/29/2019 10:31:09 AM | A | PASS |
|
|
if no one is there there is a key is in bike helmet hanging from swing to left of front door Phone #: ###-#### Inspection requested via web by Same Electric... replaced service wire from pedestal to panel in manufactured trailer...ok to final
|
ELE19-00044
| Final | 1/29/2019 | 1/29/2019 | 1/29/2019 10:00:27 AM | P | CANC |
|
|
Please call Aaron Dill 30 min prior to arrival. Thank you Phone #: ###-#### Inspection requested via web by aaron dill... rescheduled to next day 1/30/19 btwn 9:30 - 10 AM with contractor...unaware of need for rough inspection before final...will meet requirement by being on site and removing equipment as needed
|
ELE18-04653
| Final | 1/28/2019 | 1/29/2019 | 1/29/2019 9:47:31 AM | A | PASS |
|
|
See also: BLD18-04367 Phone #: ###-#### Inspection requested via web by BRS Permitting... Labelling, disconnect, and OCPD ok
|
ELE19-00294
| Temporary Service | 1/28/2019 | 1/29/2019 | 1/29/2019 9:18:44 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Greg Traudt... t/s u/g new ok
|
ELE19-00150
| Final | 1/28/2019 | 1/29/2019 | 1/29/2019 9:00:00 AM | A | PASS |
|
|
Final Inspection Contact Alex Ybarra Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek... galvonized pipe install only pole to j box
|
ELE19-00325
| Rough-In Permanent Service | 1/28/2019 | 1/29/2019 | 1/29/2019 8:39:31 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... rough ok to cover p/s u/g new ok
|
ELE19-00044
| Final | 1/28/2019 | 1/29/2019 | 1/29/2019 8:11:50 AM | A | CANC |
|
|
please call contractor 30 minutes prior to inspection Phone #: ###-#### >> Inspection requested via web by aaron dill Inspection cancelled from web by: aaron dill
|
ELE13-03331
| ELE-Aging Inspection | 1/29/2019 | 1/29/2019 | 1/29/2019 7:42:03 AM | | FAIL |
|
|
waiting on contractor...has been contacted
|