Inspections for the day of: Wednesday, January 29, 2020.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-03488 ELE-Aging Inspection1/29/20201/29/20202/5/2020 12:44:14 PM DONE
Talked with Jose on 2/4, he was to check paperwork about job in question and get back with me.
ELE19-00947 Rough-In Permanent Service1/28/20201/29/20201/29/2020 3:28:31 PMPPASS
Andy Phone #: ###-#### No service. Ok cover main floor corridor hardlids S side, 2nd floor classroom ceiling and kitchen walls.
ELE19-04415 Permanent Service1/28/20201/29/20201/29/2020 2:48:47 PMPPASS
Hi Mark, this is an upgrade to 200a. that we looked at a while back, we hope to have this in shortly after noon since the unit is also occupied! Thx. Steve, BPL Phone #: ###-#### Inspection requested via web by Steven Meredith p/s o/h rec ok
ELE17-01895 Final1/29/20201/29/20201/29/2020 1:20:30 PMPPASS
Ok final utility. Recept down low by water heater is outside 6ft zone from sink.
ELE19-04858 Electrical Rough-In1/29/20201/29/20201/29/2020 12:50:12 PMPPASS
Accidently put notes for another job and finaled out wrong permit. Ok final job on Stilson.
ELE20-00347 Electrical Rough-In1/29/20201/29/20201/29/2020 12:26:14 PMPPASS
Phone #: ###-#### Inspection requested via web by Dean Gernaat Ok cover patio.
ELE19-04309 Final1/28/20201/29/20201/29/2020 11:59:16 AMAPASS
Carl ###-#### Ok final. 25a brkr on 125a rated bussing. All labels present
ELE19-04858 Final1/28/20201/29/20201/29/2020 10:58:08 AMAPASS
Von. Phone #: ###-#### Inspection requested via web by Sean DeLacy Ok final. All labels present. 2 pole 25a brkr installed. Panel buss rating 125a.
ELE19-04838 Electrical Rough-In1/28/20201/29/20201/29/2020 10:31:24 AMAPASS
Look at flat roof discussed on previous consultation Phone #: ###-#### Inspection requested via web by Bonnie Page Ok cover house and rooftop. Rooftop has #12 UF runs for heaters in ceiling of patio. 16ga metal strips about 4-5 inches wide were installed over top of channels where wires are run. There will be about 3-4 inches of decking over the top of the wires.
MIS20-00029 ELE-Conference1/28/20201/29/20201/29/2020 10:17:28 AMADONE
ELE and PLM work being done without permit // Daryl Phone #: ###-#### Met onsite with Daryl Spivey. Electrical work is being done in the kitchen, kitchen remodel
ELE19-02947 Electrical Rough-In1/28/20201/29/20201/29/2020 10:06:24 AMAPASS
Kenny Williams is contact at ###-####. Lander St. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover pump house.
ELE19-03956 Final1/28/20201/29/20201/29/2020 9:34:50 AMAPASS
Phone #: ###-#### Inspection requested via web by Jason Scott Ok final. 35a max fuse installed.
ELE20-00094 Final1/28/20201/29/20201/29/2020 9:34:14 AMAPASS
Phone #: ###-#### Inspection requested via web by Jason Scott Ok final flr heat mstr.
ELE19-04309 Electrical Rough-In1/21/20201/29/20201/29/2020 9:33:45 AMAPASS
Karl is the onsite contact his number is ###-#### Phone #: ###-#### Inspection requested via web by Coulton Main Components UL listed.