BLD19-03386
| BLD-Final | 1/27/2020 | 1/29/2020 | 1/31/2020 12:23:51 PM | P | PASS |
|
|
See BLD19-04149 and ELE19-04007 for awning and sign installed by YESCO
|
BLD19-03326
| BLD-Wall Bracing | 1/29/2020 | 1/29/2020 | 1/29/2020 4:59:00 PM | P | PART |
|
|
Work in progress... See plans for missing floor to floor straps and bottom plate nailing, 2nd and 3rd fl... See orange paint for missing anchor/relocation, bolts...
|
BLD19-04774
| BLD-Energy code compliance | 1/29/2020 | 1/29/2020 | 1/29/2020 4:55:39 PM | P | PASS |
|
|
Nick Phone #: ###-####
|
BLD19-03101
| BLD-Final | 1/29/2020 | 1/29/2020 | 1/29/2020 4:55:15 PM | P | FAIL |
|
|
Per R310.1- Sill height to be no more than 44" above the finished floor... Down stairs bedrooms...
|
BLD19-04836
| BLD-Foundation | 1/28/2020 | 1/29/2020 | 1/29/2020 4:53:40 PM | P | PASS |
|
|
Work in progress...
|
BLD19-03101
| BLD-Blower Door Test Results | 1/29/2020 | 1/29/2020 | 1/29/2020 1:09:59 PM | P | DONE |
|
|
ACH50- 3.96
|
BLD19-03400
| BLD-Framing/Rough-in | 1/28/2020 | 1/29/2020 | 1/29/2020 11:36:13 AM | A | PASS |
|
|
Correction SAT... OK to cover...
|
BLD20-00094
| BLD-Footing | 1/28/2020 | 1/29/2020 | 1/29/2020 11:35:45 AM | A | NH |
|
|
As per phone conversation- need both ends of footing dug out to verify footing dimentions are as per plans... Need Special inspection for as built footings and foundation, X-ray/ultra-sound to verify rebar is as per Engineering...
|
BLD19-01871
| BLD-Energy code compliance | 1/24/2020 | 1/29/2020 | 1/29/2020 11:32:39 AM | A | PASS |
|
|
Corrections SAT...
|
BLD19-01870
| BLD-Final | 1/27/2020 | 1/29/2020 | 1/29/2020 11:32:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD19-01870
| DOC - Permit Finaled | 1/29/2020 | 1/29/2020 | 1/29/2020 11:31:56 AM | P | PASS |
|
|
|
BLD19-02514
| BLD-Wall Bracing | 1/28/2020 | 1/29/2020 | 1/29/2020 11:31:25 AM | A | PASS |
|
|
Ever Phone #: ###-####
|
BLD19-01874
| BLD-Framing/Rough-in | 1/27/2020 | 1/29/2020 | 1/29/2020 11:31:05 AM | A | FAIL |
|
|
Strap needed at break in double top plate... Provide Engineering fix for A1 (3) that are split/broken at bearing wall, garage/bonus room... A7G trus, bottom cord to be fastened as per Engineering, 2 row staggered at 2" o.c.... OK to insulate...
|
BLD18-03373
| BLD-Aging Inspection | 1/29/2020 | 1/29/2020 | 1/29/2020 11:27:41 AM | | DEFR |
|
|
|
BLD18-03373
| DOC - Permit Expired | 1/29/2020 | 1/29/2020 | 1/29/2020 11:27:31 AM | P | DONE |
|
|
|
BLD19-01870
| BLD-Blower Door Test Results | 1/27/2020 | 1/29/2020 | 1/29/2020 10:06:30 AM | A | DONE |
|
|
ACH50- 4.6
|