PLM99-04244
| Plumbing Rough-in | 12/30/1999 | 1/3/2000 | 1/3/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/30/1999 at 13:09:40. Contact: ###-####. R/I ok.
|
PLM99-03282
| Final | 1/3/2000 | 1/3/2000 | 1/3/2000 12:00:00 AM | A | FAIL |
|
|
Med. gas cert. incomplete, verify and complete med. air intake location, use approved fittings and joints in med. air system, verify vacuum pump is compatable with anst. gasses.
|
PLM99-03719
| Final | 1/3/2000 | 1/3/2000 | 1/3/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 08:29:10. Contact: ###-####. Final ok.
|
PLM98-01666
| Final | 1/3/2000 | 1/3/2000 | 1/3/2000 12:00:00 AM | P | FAIL |
|
|
###-####. Complete tub trim, lav S-trapped, secure dw hose to counter top.
|
PLM99-04215
| Plumbing Rough-in | 1/3/2000 | 1/3/2000 | 1/3/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 11:14:56. Contact: ###-####. R/I ok.
|