ELE99-04215
| Final | 1/3/2000 | 1/3/2000 | 1/3/2000 12:00:00 AM | P | PASS |
|
|
stan ###-#### fn. Ok.
|
ELE99-03629
| Final | 1/3/2000 | 1/3/2000 | 1/3/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/03/2000 at 09:02:14. Contact: ###-####. Garage ok.
|
ELE99-04330
| Electrical Rough-In | 1/3/2000 | 1/3/2000 | 1/3/2000 12:00:00 AM | P | FAIL |
|
|
tori ###-####. Ground to water pipe; bond to gas pipe, grounding to electrodes; ground bushing required, clearances at panel location required.
|
ELE99-04444
| Final | 1/3/2000 | 1/3/2000 | 1/3/2000 12:00:00 AM | P | FAIL |
|
|
butch ###-####. Not ready; no permit obtained for meter/main service change.
|
ELE99-04554
| Permanent Service | 12/30/1999 | 1/3/2000 | 12/30/1999 12:00:00 AM | A | PASS |
|
|
cathy ###-####. Corrections completed.
|