BLD99-02734
| BLD-Conference | 12/27/2000 | 1/3/2001 | 1/3/2001 12:00:00 AM | A | PASS |
|
|
ben ###-#### for conf wip 1/3/2001 11:03:08 AM
|
MEC00-00196
| Conference | 12/27/2000 | 1/3/2001 | 1/3/2001 12:00:00 AM | A | PASS |
|
|
ben ###-#### for conf wip 1/3/2001 11:03:16 AM
|
MEC00-03876
| Final | 1/2/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 12:17:59. Contact: ###-####. cn posted 1/3/2001 9:54:00 AM
|
BLD00-03347
| BLD-Final | 1/2/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 415 On 1/2/2001 5:06:40 PM ok for temp after fier signs occ card 1/3/2001 11:03:50 AM
|
BLD00-01876
| BLD-Framing/Rough-in | 1/3/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | PART |
|
|
shear dave ###-#### ok to side needs eng ok for type of retro fit hd at east basement wall 1/3/2001 3:05:15 PM
|
MIS00-00304
| BLD-Final | 1/3/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | NR |
|
|
Doug ###-#### not ready need elec final ect......................... 1/3/2001 4:31:58 PM
|
BLD00-02588
| BLD-Foundation | 1/3/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | PART |
|
|
COLUMN & REBAR-- GENE ###-#### spec insp 1/3/2001 1:29:52 PM
|
BLD00-00142
| BLD-Final | 1/3/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | PART |
|
|
FN OCC GLENN ###-#### OR TODD CELL ###-#### needs all sigs on card 1/3/2001 2:39:34 PM
|