BLD00-02980
| FIRE-Sprinkler Rough-in | 1/2/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 12:08:54. Contact: ###-####. preliminary inspection on requirements for sprinklers and combustible concealed areas. 1/3/2001 9:16:13 AM
|
BLD00-01431
| FIRE-Final Inspection | 1/2/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | A | FAIL |
|
|
FIRE FN- CELL MIKE-- ###-#### not builtper plans 1/4/2001 7:59:05 AM
|
BLD00-02025
| FIRE-Sprinkler Rough-in | 1/3/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | PART |
|
|
FIRE R/I KIM ###-#### 2nd floor okay 1/4/2001 7:59:42 AM
|
FIR00-00568
| INSP-Sprinkler Rough-in | 1/4/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 409 On 1/4/2001 8:00:54 AM
|