BLD00-02436
| BLD-Wall cover | 1/3/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 07:23:46. Contact: ###-####.c/n issued. exterior shear ok. 1/3/2001 10:48:39 AM
|
BLD00-02293
| BLD-Final | 1/2/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | A | PASS |
|
|
###-####: C. of O. issued 1/3/2001 9:15:43 AM
|
BLD00-01232
| BLD-Energy code compliance | 1/2/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/02/2001 at 13:09:21. Contact: ###-####. Prior c/n items not completed. 1/3/2001 9:38:41 AM
|
BLD00-02443
| BLD-Final | 1/2/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | FAIL |
|
|
George ###-#### c/n issued 1/3/2001 2:04:11 PM
|
MEC00-04454
| Rough-in | 1/3/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | PASS |
|
|
R/I --GERRY ###-#### --RE-INSP
|
BLD00-02804
| BLD-Framing/Rough-in | 1/3/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/03/2001 at 10:01:54. Contact: ###-####. c/n issued 1/3/2001 1:04:36 PM
|
BLD00-02255
| BLD-Framing/Rough-in | 1/3/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | FAIL |
|
|
SHEAR ###-####- MARSHALL c/n issued 1/3/2001 3:03:34 PM
|
BLD00-03601
| BLD-Footing | 1/3/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | PART |
|
|
FT INSP-- TODD ###-#### rebar not totally installed.1/3/2001 3:33:29 PM 1/3/2001 3:33:37 PM 1/3/2001 3:33:51 PM
|
BLD00-03683
| BLD-Conference | 1/3/2001 | 1/3/2001 | 1/3/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 420 On 1/3/2001 3:34:38 PM
|