PLM02-00010
| Plumbing Rough-in | 1/2/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | A | PART |
|
|
scott-- cell ###-####--please call after insp is done/thanks water line ok needs dcva test 1/3/2002 9:33:30 AM
|
PLM01-03592
| Med/Gas Systems | 1/2/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/02/2002 at 11:33:05. Contact: ###-####. med air test is still up but the vacuum system is bown to 5psi. 1/3/2002 9:15:17 AM
|
PLM01-04210
| Sprinkler (Final) | 1/2/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 330 On 1/2/2002 3:21:45 PM
|
PLM01-02062
| Final | 1/2/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/02/2002 at 17:01:22. Contact: ###-####. final ok with lav as a future fixture 1/3/2002 2:24:48 PM
|
PLM01-03373
| Final | 1/3/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 08:03:08. Contact: ###-####.
|
PLM01-03428
| Final | 1/3/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/03/2002 at 08:24:18. Contact: ###-####.
|
PLM01-03592
| Med/Gas Systems | 1/3/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 330 On 1/3/2002 9:14:22 AM air and vacuum test started, vac-17psi, air 156psi 1/3/2002 1:29:32 PM
|