BLD01-01204
| BLD-Final | 1/2/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | A | PASS |
|
|
###-#### ok perm oc. 1/3/2002 11:13:28 AM
|
BLD01-02393
| BLD-Framing/Rough-in | 1/2/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | A | CANC |
|
|
###-####
|
BLD01-03206
| BLD-Footing | 1/2/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | A | NR |
|
|
###-####Appears to have just started excavation . 1/3/2002 10:18:58 AM
|
BLD01-03205
| BLD-Footing | 1/2/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | A | NR |
|
|
###-#### Appears to have just started excavation. 1/3/2002 10:18:35 AM
|
BLD01-02967
| BLD-Framing/Rough-in | 1/3/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | PART |
|
|
###-#### Conference on exiting. 1/3/2002 3:00:24 PM
|
MIS01-00239
| BLD-Final | 1/3/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | PART |
|
|
BLOCK AND TIE ###-####. Ok to skirt blocking ok. 1/3/2002 3:15:31 PM
|
MIS01-00240
| BLD-Conference | 1/3/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | PART |
|
|
BLOCK AND TIE ###-#### . Ok to skirt . 1/3/2002 3:06:38 PM
|
BLD01-00308
| BLD-Final | 1/3/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | CANC |
|
|
|
BLD01-00737
| BLD-Framing/Rough-in | 1/3/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | PART |
|
|
###-#### . Informed contractor that all floor ceiling assemblies are required to be fire stoped at the top plates and florr line ,plumbing ele and conduit etc to maintain 1 hr fire resistive construction. bettween floors. no c/n posted. They will contact rep for product used and recall when ready. 1/3/2002 5:18:00 PM 1/4/2002 4:47:54 PM
|