FIR01-00291
| INSP-Sprinkler Rough-in/Hydro | 1/2/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | PASS |
|
|
Underground hydro test OK 1/3/2002 3:52:11 PM
|
MIS01-00221
| FIR-Final | 1/3/2002 | 1/3/2002 | 1/3/2002 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 430 On 1/3/2002 2:46:46 PM Letters on sign at door to be 1" high, hall door still needs correct hardware
|