FIR02-00206
| FIR-Aging Inspection | 1/3/2003 | 1/3/2003 | 1/6/2003 12:00:00 AM | | PART |
|
|
talked to Dan and he will schedule for this week; he will need to schedule with MT people to sound the alarms 1/6/2003 1:10:09 PM
|
FIR02-00165
| INSP-Final Inspection | 1/3/2003 | 1/3/2003 | 1/3/2003 12:00:00 AM | A | PASS |
|
|
|
BLD01-00492
| FIRE-Final Inspection | 1/3/2003 | 1/3/2003 | 1/3/2003 12:00:00 AM | P | PASS |
|
|
Cathy has the occ. card - let her know if final is approved - Thanks
|
BLD02-02202
| FIRE-Conference | 1/3/2003 | 1/3/2003 | 1/3/2003 12:00:00 AM | P | PART |
|
|
received a call from Jim Storey about the fire sprinkler riser isn't connected. This building is separated by a 2 hr wall from Office Depot. This building isn't sprinklered. 1/3/2003 1:17:16 PM
|
FIR02-00443
| INSP-Final Inspection | 1/3/2003 | 1/3/2003 | 1/3/2003 12:00:00 AM | P | FAIL |
|
|
horn/strobes are too high need to be 80-96 inches; need to test the alarms 1/3/2003 3:49:40 PM 1/3/2003 3:50:06 PM
|
BLD02-01521
| FIRE-Final Inspection | 1/3/2003 | 1/3/2003 | 1/3/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/03/2003 at 07:23:15. Contact: ###-####. fire sprinklers overspaced - need to submit plans for review prior to doing the work; main exit has thumb turn; second exit has thumb turn deadbolt - need to open without special knowledge; exit sign not working; horn/strobes are too high need to be 80-96 inches; need to test the alarms 1/3/2003 3:49:20 PM
|
FIR02-00142
| INSP-Final Inspection | 1/2/2003 | 1/3/2003 | 1/3/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 01/02/2003 at 09:18:14. Contact: ###-####. this is a state building and not under our AHJ 1/3/2003 2:10:55 PM
|