PLM04-02442
| Water and/or Sewer | 1/4/2005 | 1/3/2005 | 1/4/2005 12:00:00 AM | P | PART |
|
|
piping on sewer complete but Public Works needs to come to the job site to verify the sewer stub they are connected to is the one to this lot., due to concerns from property owner to the north, 2230 broadway who claims ownership of the stub.
|
PLM04-03902
| Final | 12/30/2004 | 1/3/2005 | 1/3/2005 12:00:00 AM | P | PART |
|
|
rp on ice mechine condensor, needs vtr 1/3/2005 5:04:33 PM
|
PLM05-00002
| Sprinkler (Final) | 1/3/2005 | 1/3/2005 | 1/3/2005 12:00:00 AM | P | PASS |
|
|
clyde-- ###-#### cell sp final ok 1/3/2005 1:59:56 PM
|
PLM04-03903
| Plumbing Rough-in | 1/3/2005 | 1/3/2005 | 1/3/2005 12:00:00 AM | P | PASS |
|
|
amy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ri ok with insulation between water lines in garage ceiling and garage space. 1/3/2005 2:21:24 PM
|
PLM03-03109
| Plumbing Rough-in | 1/3/2005 | 1/3/2005 | 1/3/2005 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 1/3/2005 at 10:36:01 AM. Contact: ###-####. kitchen and bar sink by the stairs ok 1/3/2005 1:42:16 PM
|