ESC05-01696
| Complaint Inspection | 12/29/2005 | 1/3/2006 | 1/3/2006 4:17:13 PM | P | PART |
|
|
|
ESC05-01697
| Complaint Inspection | 12/29/2005 | 1/3/2006 | 1/3/2006 4:16:54 PM | P | PART |
|
|
Follow up
|
ESC05-01689
| Complaint Inspection | 12/29/2005 | 1/3/2006 | 1/3/2006 4:16:35 PM | P | PART |
|
|
Follow up
|
ESC04-01055
| Conference | 1/3/2006 | 1/3/2006 | 1/3/2006 12:00:00 AM | P | DONE |
|
|
Informed RP, Cameron that sediment basins requires maintaince if sediment built up is 1/2 depth of basin. Also, liquid needs to be pumped into a tanker and then offloaded at an acceptable location or pumped on site into vegetation if a large enough area is available. Also, any other maintance bmp's should be installed prior to next rain event. Will follow up. ; Phone #: ###-####
|
ESC05-01130
| Random Inspection | 1/3/2006 | 1/3/2006 | 1/3/2006 12:00:00 AM | P | PART |
|
|
Overall things look pretty good; comments given to contractor regarding access controls to reduce mud/dirt track out.
|