FIR06-00167
| FIR-Aging Inspection | 1/3/2007 | 1/3/2007 | 1/9/2007 1:18:05 PM | | DONE |
|
|
Demo work appears to have been completed, contractor needs to request final.
|
FIR06-00822
| INSP-Final Inspection | 1/2/2007 | 1/3/2007 | 1/4/2007 9:37:31 AM | P | PASS |
|
|
Fire alarm work passed inspection, one blocked a/v relocated while on site, permit finaled.
|
FIR06-00729
| INSP-Final Inspection | 1/2/2007 | 1/3/2007 | 1/4/2007 9:35:42 AM | P | FAIL |
|
|
Notification devices are obstructed by office partitions at three locations, need to relocate a/v's to provide full coverage as required.
|
FIR05-00695
| INSP-Alarm Testing | 1/3/2007 | 1/3/2007 | 1/3/2007 2:47:07 PM | P | PART |
|
|
Inspection completed for the 10th floor guest rooms and common corridor. Strobe notification devices are not yet synchronized on general alarm, non-functional speaker in room 1019 repaired while on site. Guest rooms, manual pulls, SD's, fire dampers tested okay.
|
FIR06-00639
| INSP-Sprinkler Rough-in/Hydro | 1/2/2007 | 1/3/2007 | 1/3/2007 11:38:50 AM | A | PART |
|
|
AG hydrostatic test for the garage area first level passed.
|
BLD06-02302
| FIRE-Final Inspection | 1/2/2007 | 1/3/2007 | 1/3/2007 10:47:59 AM | A | PASS |
|
|
Fire life safety inspection passed.
|
BLD04-00942
| FIRE-Final Inspection | 1/2/2007 | 1/3/2007 | 1/3/2007 10:14:33 AM | A | PART |
|
|
Cold cavity protection for the 3rd floor at building #7 is satisfactory, one area lacking proper insulation at the SW unit repaired while on site, rough-in is okay to cover.
|
BLD06-01968
| FIRE-Final Inspection | 1/2/2007 | 1/3/2007 | 1/3/2007 9:33:49 AM | A | PASS |
|
|
Required corrections have been completed, life safety inspection passed.
|