Inspections for the day of: Wednesday, January 3, 2018.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-03473 Final1/3/20181/3/20181/3/2018 3:52:07 PMPFAIL
Phone #: ###-#### Inspection requested via web by Kevin Perez
BCC 4-05-17(C)- It shall be unlawful to impede inspector. House staged prior to inspectoin. Unable to check all receptacles.
110.3- Devices shall be wired as per instructions. Stair 3 way switch miswire. Master bath GFCI will not hold for test.
210.8- Washer receptacle located with in 6' of a sink shl have GFCI protection. Recetpacles located in unfinished basement room shall have GFCI protection.
210.12- Master bed and down bed shall have AFCI protection. Breakers labeled GFCI only.
210.52(B)- Receptacle for island counter top shall be located with in 6" of overhang.
210.52(D)- Required bathroom receptacles shall be located adjacent to each basin. Add additional for 2nd down bath basin.
210.70- Luminaire shall be installed at each door with exterior access. Basement patio light needs installed.
422.30- Water heater shall have a disconnecting means with in sight of appliance. 110.25 lockout acceptable.
ELE17-04364 Conference1/3/20181/3/20181/3/2018 2:34:52 PMPDONE
Kitchen remodel/new addition. Call Jimmy prior to arrival to meet you there. ###-#### Phone #: ###-#### Inspection requested via web by John Edwards
Discussed areas of existing dwelling that will require updating.
BCC 4-05-32- Code violations not to be retained.
Split bus panel ok to remain as long as number of disconnecting means does not exceed 6. All conduits and cables installed in wet locations shall be rated for such location. House has a large number of junction boxes which shall remain accessible. Laundry circuit shall be added to laundry room in basement. Bathroom plumbing being replaced, wiring ok to remain. New work to include relocating kitchen area and adding bed and bath to east side of dwelling.
ELE17-03834 Electrical Rough-In1/3/20181/3/20181/3/2018 1:47:40 PMPPASS
Requesting a overhead ceiling rough in, for East end area. Lighting seismic wires for all fixtures are installed, existing raceways have been strapped and supported, new equipment installed. Phone #: ###-#### Inspection requested via web by Kurt Carlson
Area noted east grid rough in ok cover
ELE17-03877 Electrical Rough-In12/28/20171/3/20181/3/2018 10:55:11 AMAPASS
Call Rafael for inspection of new framed walls outside of the grand ballroom. Please call 30 minutes in advance to ensure access to the building. Thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Main ballroom entrance wall rough in ok cover.
ELE18-00006 Temporary Service1/2/20181/3/20181/3/2018 10:04:37 AMAPASS
Overhead temp pole. If you have any questions please feel free to call CJ ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clay Morgan t/s o/h n ok
ELE17-04333 Electrical Rough-In1/2/20181/3/20181/3/2018 9:36:34 AMACANC
Rough in walls/ceiling lower level Phone #: ###-#### Inspection requested via web by Bryan Atkins
Walls and hardlids level 1 office, entrance, lounge, level 2 conference room floor receptacles required rough in ok cover
ELE18-00016 Temporary Service1/2/20181/3/20181/3/2018 8:36:41 AMAPASS
Phone #: ###-#### Inspection requested via web by George Pascua
t/s u/g n ok