ELE17-03125
| Final | 1/3/2018 | 1/3/2018 | 1/3/2018 2:17:27 PM | P | PASS |
|
|
Mucho Phone #: ###-#### final ok
|
ELE16-02746
| Electrical Rough-In | 1/3/2018 | 1/3/2018 | 1/3/2018 1:33:08 PM | P | PASS |
|
|
509-519 reinspect soffit rough Phone #: ###-#### Inspection requested via web by Kenneth Chapman corrections made soffits ok to cover
|
ELE17-02095
| Electrical Rough-In | 1/3/2018 | 1/3/2018 | 1/3/2018 12:58:56 PM | P | FAIL |
|
|
call Mike Cole with any questions ###-#### Phone #: ###-#### Inspection requested via web by Mike Cole 210.52E3 Outdoor receps front and back of dwelling . 210.70A22. Exterior lighting shall be provided at garage man door. 314.27C.Boxes at ceiling fan locations shall be listed for the purpose.
|
ELE17-03513
| Final | 1/3/2018 | 1/3/2018 | 1/3/2018 12:00:07 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Archibald correction made final ok
|
ELE17-03266
| Final | 1/2/2018 | 1/3/2018 | 1/3/2018 11:34:38 AM | A | PASS |
|
|
This is final for blanket permit bldg 51 tool installs Phone #: ###-#### Inspection requested via web by Ken Heller blanket permit only final ok
|
ELE17-04359
| Rough-In Permanent Service | 1/2/2018 | 1/3/2018 | 1/3/2018 10:22:13 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn rough in ok p/s u/g n ok
|
ELE17-03681
| Final | 1/2/2018 | 1/3/2018 | 1/3/2018 9:19:45 AM | A | PASS |
|
|
Approved plans onsite. Phone #: ###-#### Inspection requested via web by Ryan King corrections made final ok
|
ELE18-00012
| Rough-In Permanent Service | 1/2/2018 | 1/3/2018 | 1/3/2018 9:19:05 AM | A | PASS |
|
|
Can we have this inspection as soon as possible in the am? Thanks Phone #: ###-#### Inspection requested via web by Alan Lusk rough in ok p/s u/g n ok
|