BLD17-00269
| FIRE-Final Inspection | 1/3/2018 | 1/3/2018 | 1/3/2018 3:08:34 PM | P | CANC |
|
|
Wrong building called in.
Cory Phone #: ###-####
|
BLD17-04228
| FIRE-Final Inspection | 12/28/2017 | 1/3/2018 | 1/3/2018 1:24:36 PM | A | PASS |
|
|
Life safety passed
Will or Lauren Phone #: ###-####
|
FIR17-00217
| INSP-Final Inspection | 12/29/2017 | 1/3/2018 | 1/3/2018 11:50:50 AM | A | CANC |
|
|
Paul Phone #: ###-####
|
FIR17-00717
| INSP-Final Inspection | 1/2/2018 | 1/3/2018 | 1/3/2018 10:32:07 AM | A | PASS |
|
|
Permit finaled
|
FIR13-00682
| INSP-Final Inspection | 1/2/2018 | 1/3/2018 | 1/3/2018 10:31:51 AM | A | CANC |
|
|
Ray McQueen will be the technician. ###-####. Building access 8-5. Phone #: ###-#### Inspection requested via web by Rose Peterson
|
FIR17-00713
| INSP-Final Inspection | 1/2/2018 | 1/3/2018 | 1/3/2018 9:45:55 AM | A | FAIL |
|
|
I verifed the equipment but since the dry system exceeds 1,400 gallons I will need to trip test for time. Due to cold temperatures the contractor choose to waite for warmer weather. The new low air and water flow pressure switches will need to be verified at that time as well. Per Rick the system was tripped the previous day and functioned correctly.
Rick Phone #: ###-####
|