ELE14-00248
| ELE-Aging Inspection | 1/3/2019 | 1/3/2019 | 1/8/2019 10:08:00 AM | | PASS |
|
|
job complete, final ok
|
ELE14-01181
| ELE-Aging Inspection | 1/3/2019 | 1/3/2019 | 1/3/2019 10:55:42 AM | | DONE |
|
|
Contacted contractor, reminded them of corections need to be corrected
|
ELE18-04430
| Electrical Rough-In | 1/3/2019 | 1/3/2019 | 1/3/2019 10:24:49 AM | A | PASS |
|
|
Phase one Rough-in ok cover ceiling grid
|