Inspections for the day of: Friday, January 3, 2020.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-04905 Conference1/3/20201/3/20201/3/2020 2:55:01 PMPPASS
call ahead leland Phone #: ###-####...
discussed requirements to get power to shop...what needs to be done to shop that is wired before inspection-m/c, metal boxes-mud rings and ground screws needed
service changed required to feed shop with power..discussed new grounding and all-in-one...ground wire needs installed from main service to shop and ground to installed uffer
verify depth of pipe for feeders-installed before inspection-by open ends at shop and junction boxes at pole
ELE20-00017 Permanent Service1/3/20201/3/20201/3/2020 2:37:15 PMPPASS
Phone #: ###-#### home owner number... Inspection requested via web by Bayley Beard..
p/s u/g reconnect ok
ELE19-03930 Electrical Rough-In1/2/20201/3/20201/3/2020 12:23:34 PMPPASS
Scott Phone #: ###-####...
rough ok to cover
junction boxes need mudrings installed..bedroom and bathroom...verify at final accessability
ELE19-04190 Final12/31/20191/3/20201/3/2020 11:49:00 AMPPASS
Could also do Thursday afternoon not later than 2:30 Phone #: ###-#### Inspection requested via web by Brett Benegar...
ok to final...outlets verified
ELE20-00019 Temporary Service1/3/20201/3/20201/3/2020 11:06:04 AMPPASS
###-####, new contact phone number, sorry, Reuben Royce he should answer, i also gave him your number, thank you very much. Phone #: ###-#### Inspection requested via web by Debby Pierce...
t/s o/h new ok....back SE corner of vacant field next to Maverik gas station
ELE19-04469 Electrical Rough-In1/2/20201/3/20201/3/2020 10:33:36 AMAPASS
Phone #: ###-#### Inspection requested via web by Bayley Beard...
rough in of seating area and walkways ok to cover...future rough inspections required for ceiling piping for special affects equipment and new power feeds to control room
ELE19-04868 Electrical Rough-In1/2/20201/3/20201/3/2020 9:21:43 AMAPASS
Bonding inspection for Therapy Swimming Pool.. They need to cover perimeter of pool area... Phone #: ###-#### Inspection requested via web by JOHN MCCURDY...bonding for auto chair, rail, 4 corners, cover and EQ potential ring
discussed EQ at back wall and wet niche verify at next inspection
ELE20-00017 Final1/2/20201/3/20201/3/2020 8:36:25 AMACANC
Phone #: ###-#### Inspection requested via web by Bayley Beard...moved to PM as per contractor
ELE20-00018 Electrical Rough-In1/2/20201/3/20201/3/2020 8:15:09 AMAPASS
bonding for pool// First thing in AM please// Scott Phone #: ###-####...
bonding 4 corners, auto cover, and bond to equipment ok...pouring shell only at this time...LED lighting...EQ bond, underground, and power supply will require future inspections