PLM01-00195
| Plumbing Rough-in | 1/29/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 14:05:45. Contact: ###-####.
|
PLM00-01644
| Final | 1/29/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 15:32:29. Contact: ###-####. test all bfp's, install all fixtures and equipment coffee makers, steam equipment, shop equipment, install solid covers on interceptor, install dip tubes on interceptor, install drain on water heater pan, flash all roof penitrations 1/30/2001 10:37:41 AM
|
PLM00-02080
| Water and/or Sewer | 1/30/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 1/30/2001 9:14:26 AM additional inspections called in under debest permit in dec and interceptor tests were eventually passed
|
PLM00-02080
| Final | 1/30/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 1/30/2001 9:14:52 AM final ok
|
PLM01-00125
| Final | 1/30/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 10:55:21. Contact: ###-####. incomplete 1/30/2001 1:59:00 PM
|