Inspections for the day of: Tuesday, January 30, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03140 BLD-Final1/29/20011/30/20011/30/2001 12:00:00 AMAPASS
###-#### Rex... Per approved plans re property lines, openings. ok, l/c issued. 1/30/2001 10:27:01 AM
BLD00-03185 BLD-Footing1/29/20011/30/20011/30/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/29/2001 at 14:43:13. Contact: ###-####. mti report pending...need surveyors statement for p.l. 1/30/2001 9:43:43 AM
BLD00-01970 BLD-Final1/29/20011/30/20011/30/2001 12:00:00 AMAPASS
Glenn Anderson ###-####
BLD00-02123 BLD-Final1/29/20011/30/20011/30/2001 12:00:00 AMANR
FN INSP- ###-####- STEVEN conf only w/ owner 1/30/2001 10:07:32 AM
BLD00-03650 BLD-Conference1/30/20011/30/20011/30/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 1/30/2001 11:11:06 AM w/ owner, insul installed at ext; complete framing & call for insp.
BLD00-02123 BLD-Framing/Rough-in1/30/20011/30/20011/30/2001 12:00:00 AMAFAIL
Added by Inspector: 340 On 1/30/2001 10:09:04 AM roof rebuild appears ok, nail-off sheathing,obtain other insps...ok to continue perconference w/ owner
BLD00-00771 BLD-Framing/Rough-in1/30/20011/30/20011/30/2001 12:00:00 AMPPART
Paul ###-#### ok to cover high ceiling & upper 1/2 demising wall at 1/30/2001 5:14:30 PM 2nd fl. 1/30/2001 5:21:02 PM
BLD00-01563 BLD-Concrete1/29/20011/30/20011/30/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/29/2001 at 06:35:07. Contact: ###-####... pending spec. insp report 1/30/2001 1:54:47 PM
BLD00-03190 BLD-Framing/Rough-in1/30/20011/30/20011/30/2001 12:00:00 AMPPART
###-#### c/n ok, unable to access underfloor, chk at final or? 1/30/2001 3:19:45 PM ok to cover 1/30/2001 3:20:03 PM
BLD00-03190 BLD-Energy code compliance1/30/20011/30/20011/30/2001 12:00:00 AMPPART
check underfloor, attic at final 1/30/2001 3:20:33 PM
BLD00-03191 BLD-Framing/Rough-in1/30/20011/30/20011/30/2001 12:00:00 AMPPART
Added by Inspector: 340 On 1/30/2001 3:19:03 PM c/n issued, fireblocks, install int. shear etc. ok to insul pending hvac ok
BLD00-01903 BLD-Final1/30/20011/30/20011/30/2001 12:00:00 AMPFAIL
###-#### HOUSE IS OPEN AND CARPET GUYS ARE THERE., need driveway or bond? 1/30/2001 4:05:31 PM
BLD01-00184 BLD-Footing1/29/20011/30/20011/30/2001 12:00:00 AMPNR
###-#### , mono-slab, need plbg r/i...thaw ground & protect concrete from freeze when pouring. 1/30/2001 10:43:58 AM excavation nly looks ok; insulate slab 1/30/2001 10:44:29 AM