BLD01-00071
| BLD-Framing/Rough-in | 1/29/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | A | PASS |
|
|
CALL 1ST BEFORE INSP SHEILA ###-#### FR
|
BLD01-00098
| BLD-Energy code compliance | 1/29/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | A | FAIL |
|
|
###-#### no plans on site 1/30/2001 10:43:26 AM
|
BLD00-03663
| BLD-Conference | 1/29/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | A | PASS |
|
|
###-####conf with building owner make sure and call first; conf on draft stop need arch detail forv same 1/30/2001 11:30:56 AM
|
BLD00-03089
| BLD-Framing/Rough-in | 1/30/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 10:16:31. Contact: ###-####. air seal ok 1/30/2001 4:04:07 PM
|
BLD00-02525
| BLD-Final | 1/30/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | P | PASS |
|
|
ok for perm occ 1/30/2001 5:19:48 PM
|
BLD00-02100
| BLD-Final | 1/30/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 11:13:23. Contact: ###-####. not ready to many items incomplete 1/30/2001 3:33:15 PM
|