ELE01-00149
| Electrical Rough-In | 1/26/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 10:00:33. Contact: . ok cover walls only in rooms 001n, 001m, 001l, 001k, @ 001j 1/31/2001 12:42:08 PM
|
ELE01-00247
| Electrical Rough-In | 1/30/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | P | PASS |
|
|
###-#### ok cover ri 1/31/2001 10:49:46 AM
|
ELE01-00308
| Electrical Rough-In | 1/30/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 09:01:47. Contact: ###-####. conf with contractor 1/31/2001 10:49:26 AM
|
ELE00-02571
| Final | 1/30/2001 | 1/30/2001 | 1/30/2001 12:00:00 AM | P | PART |
|
|
###-#### ok part final 1/31/2001 10:48:54 AM
|