Inspections for the day of: Wednesday, January 30, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-04033 PLM-Aging Inspection1/30/20021/30/20021/30/2002 12:00:00 AM NR
PLM01-02569 PLM-Aging Inspection1/30/20021/30/20021/30/2002 12:00:00 AM NR
PLM02-00161 Groundwork1/29/20021/30/20021/30/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/29/2002 at 14:26:11. Contact: ###-####.
PLM01-03806 Final1/29/20021/30/20021/30/2002 12:00:00 AMAPART
###-#### need to change t&p on water heater cap off unused lines in basement ,caulk toilets,raise drain hose from dishwasher to bottom of cabnit, provide adequate water pressure to drinking fountain 1/31/2002 10:57:51 AM
PLM01-01413 Final1/29/20021/30/20021/30/2002 12:00:00 AMPPASS
###-####
PLM02-00181 Groundwork1/30/20021/30/20021/30/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/30/2002 at 08:23:05. Contact: . east end groundwork done air test ok 1/30/2002 4:32:40 PM
PLM02-00218 Plumbing Rough-in1/30/20021/30/20021/30/2002 12:00:00 AMPFAIL
JIM , PLEASE CALL RON AT ###-#### BEFORE YOU GO OUT SO HE CAN MEET YOU THERE TO LET YOU IN ... abs drain lines need to be supported every four feet support pex piping every 32 inches also need some additional cleanout,s installed. cap off all abandon drain lines 1/30/2002 3:48:24 PM
PLM01-03641 Groundwork1/30/20021/30/20021/30/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/30/2002 at 09:41:01. Contact: ###-####. groundwork in restroom area air test -ok contractor to call when rest of groundwork is ready 1/30/2002 5:19:00 PM
PLM01-02891 Plumbing Rough-in1/30/20021/30/20021/30/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/30/2002 at 10:48:14. Contact: ###-####.
PLM01-02105 Plumbing Rough-in1/30/20021/30/20021/30/2002 12:00:00 AMPPART
Scheduled by Inspector: 360 On 1/30/2002 5:52:54 PM third section of testing floor, 1 through 4 water test ok this inspection is in building C 1/30/2002 5:59:53 PM