BLD01-00308
| BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | A | PASS |
|
|
###-####. Ok to sheetrock all of building. 1/30/2002 12:25:55 PM
|
MEC02-00084
| Final | 1/30/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 07:15:49. Contact: ###-####.
|
BLD01-03042
| BLD-Final | 1/29/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | A | NH |
|
|
###-#### ###-####
|
BLD01-03042
| BLD-Final | 1/29/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | P | NR |
|
|
###-#### ###-####. No palns on site. 1/31/2002 2:08:44 PM
|
BLD01-03049
| BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | P | PART |
|
|
###-#### john. Restrooms subject to ele insp. 1/31/2002 2:08:28 PM
|
BLD01-02254
| BLD-Final | 1/30/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 10:25:12. Contact: ###-####.
|
BLD01-00737
| BLD-Framing/Rough-in | 1/30/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | P | PART |
|
|
rich- ###-#### fr insp Posted a c/nat the site. 1/31/2002 2:07:59 PM
|