Inspections for the day of: Wednesday, January 30, 2002.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02374 BLD-Aging Inspection1/30/20021/30/20021/30/2002 12:00:00 AM PASS
permit active 1/30/2002 7:51:18 AM
BLD02-00079 BLD-Foundation1/29/20021/30/20021/30/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/29/2002 at 12:26:56. Contact: ###-####. wip--reviewed cold weather requirements. 1/30/2002 9:38:55 AM
MEC01-03616 Pressure Test1/29/20021/30/20021/30/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/29/2002 at 15:46:39. Contact: ###-####. Upstairs gas line which feeds fireplace. 1/30/2002 10:06:31 AM
MEC02-00239 Rough-in1/29/20021/30/20021/30/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/29/2002 at 15:51:46. Contact: . gas fireplace 1/30/2002 9:38:30 AM
BLD01-02375 BLD-Framing/Rough-in1/29/20021/30/20021/30/2002 12:00:00 AMAPASS
###-#### TERI SHEAR INSPECT--ok -- 1/30/2002 9:15:19 AM
BLD01-03210 BLD-Framing/Rough-in1/29/20021/30/20021/30/2002 12:00:00 AMAPASS
###-#### talked to contractor--eng. received for g.lam-ok to cover 1/30/2002 10:32:26 AM
MEC02-00193 Rough-in1/29/20021/30/20021/30/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/29/2002 at 17:13:36. Contact: . B-vent does not have 1" clearance upstairs 1/30/2002 8:55:53 AM
MEC02-00205 Final1/24/20021/30/20021/30/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/24/2002 at 13:15:55. Contact: ###-####. Not ready for final on gas fireplace-gas line is needed plus pressure test prior to calling for inspection. 1/30/2002 12:43:50 PM
BLD01-03179 BLD-Framing/Rough-in1/29/20021/30/20021/30/2002 12:00:00 AMPPART
###-#### Energy not framing--ok to cover except 2-floor area where fireplace B-Vent does not have required 1" clearance to combustable and an around attic b-vent a spacer required to prevent insulation from packing around. 1/30/2002 12:58:33 PM
BLD02-00052 BLD-Foundation1/30/20021/30/20021/30/2002 12:00:00 AMPPART
wip 1/30/2002 3:01:55 PM
BLD01-03285 BLD-Footing1/30/20021/30/20021/30/2002 12:00:00 AMPPART
CLINT ###-#### wip--informed contractor that due to cold temps. blankets needed at least 72 hours. 1/30/2002 2:36:35 PM
BLD02-00041 BLD-Footing1/30/20021/30/20021/30/2002 12:00:00 AMPPART
ft dane- ###-#### wip--advised contractor to cover concrete due to cold weather. 1/30/2002 2:13:59 PM
BLD01-02890 BLD-Footing1/30/20021/30/20021/30/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/30/2002 at 10:43:15. Contact: ###-####. wip--15% ready--Inspector infomed contractor to cover --soil free of frost at time of inspection. 1/30/2002 1/30/2002 1:24:03 PM
BLD01-03223 BLD-Footing1/30/20021/30/20021/30/2002 12:00:00 AMPCANC
CHRIS ###-#### by contractor 1/30/2002 12:30:59 PM