BLD01-02374
| BLD-Aging Inspection | 1/30/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | | PASS |
|
|
permit active 1/30/2002 7:51:18 AM
|
BLD02-00079
| BLD-Foundation | 1/29/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 12:26:56. Contact: ###-####. wip--reviewed cold weather requirements. 1/30/2002 9:38:55 AM
|
MEC01-03616
| Pressure Test | 1/29/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 15:46:39. Contact: ###-####. Upstairs gas line which feeds fireplace. 1/30/2002 10:06:31 AM
|
MEC02-00239
| Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 15:51:46. Contact: . gas fireplace 1/30/2002 9:38:30 AM
|
BLD01-02375
| BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | A | PASS |
|
|
###-#### TERI SHEAR INSPECT--ok -- 1/30/2002 9:15:19 AM
|
BLD01-03210
| BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | A | PASS |
|
|
###-#### talked to contractor--eng. received for g.lam-ok to cover 1/30/2002 10:32:26 AM
|
MEC02-00193
| Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 17:13:36. Contact: . B-vent does not have 1" clearance upstairs 1/30/2002 8:55:53 AM
|
MEC02-00205
| Final | 1/24/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/24/2002 at 13:15:55. Contact: ###-####. Not ready for final on gas fireplace-gas line is needed plus pressure test prior to calling for inspection. 1/30/2002 12:43:50 PM
|
BLD01-03179
| BLD-Framing/Rough-in | 1/29/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | P | PART |
|
|
###-#### Energy not framing--ok to cover except 2-floor area where fireplace B-Vent does not have required 1" clearance to combustable and an around attic b-vent a spacer required to prevent insulation from packing around. 1/30/2002 12:58:33 PM
|
BLD02-00052
| BLD-Foundation | 1/30/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | P | PART |
|
|
wip 1/30/2002 3:01:55 PM
|
BLD01-03285
| BLD-Footing | 1/30/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | P | PART |
|
|
CLINT ###-#### wip--informed contractor that due to cold temps. blankets needed at least 72 hours. 1/30/2002 2:36:35 PM
|
BLD02-00041
| BLD-Footing | 1/30/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | P | PART |
|
|
ft dane- ###-#### wip--advised contractor to cover concrete due to cold weather. 1/30/2002 2:13:59 PM
|
BLD01-02890
| BLD-Footing | 1/30/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/30/2002 at 10:43:15. Contact: ###-####. wip--15% ready--Inspector infomed contractor to cover --soil free of frost at time of inspection. 1/30/2002 1/30/2002 1:24:03 PM
|
BLD01-03223
| BLD-Footing | 1/30/2002 | 1/30/2002 | 1/30/2002 12:00:00 AM | P | CANC |
|
|
CHRIS ###-#### by contractor 1/30/2002 12:30:59 PM
|