PLM02-03320
| PLM-Aging Inspection | 1/30/2003 | 1/30/2003 | 1/30/2003 12:00:00 AM | | NR |
|
|
called will call when ready 1/30/2003 5:38:38 PM
|
PLM02-03321
| PLM-Aging Inspection | 1/30/2003 | 1/30/2003 | 1/30/2003 12:00:00 AM | | NR |
|
|
called will call when ready 1/30/2003 5:38:56 PM
|
PLM02-03579
| Final | 1/29/2003 | 1/30/2003 | 1/30/2003 12:00:00 AM | A | PASS |
|
|
###-#### final ok but fixture count should be 4-wc, 5-lav, 3-tub/sh, 1-sink, 1-cw, 1-lt, 1-wh 1/29/2003 2:22:00 PM
|
PLM03-00178
| Final | 1/29/2003 | 1/30/2003 | 1/30/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/29/2003 at 13:25:40. Contact: ###-####. final ok eyewash shower inside upper dock mask 1/30/2003 9:39:56 AM
|
PLM02-03811
| Plumbing Rough-in | 1/29/2003 | 1/30/2003 | 1/30/2003 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 01/29/2003 at 15:42:34. Contact: ###-####. needs t&p and pan drain 1/30/2003 5:50:44 PM
|