ELE05-02192
| ELE-Aging Inspection | 1/30/2006 | 1/30/2006 | 1/31/2006 8:01:26 AM | | NR |
|
|
suc
|
ELE04-02585
| ELE-Aging Inspection | 1/30/2006 | 1/30/2006 | 1/31/2006 7:59:48 AM | | NR |
|
|
suc
|
ELE04-02618
| ELE-Aging Inspection | 1/30/2006 | 1/30/2006 | 1/31/2006 7:59:09 AM | | NR |
|
|
suc
|
ELE06-00173
| Electrical Rough-In | 1/30/2006 | 1/30/2006 | 1/30/2006 3:07:01 PM | P | NR |
|
|
call 1st for access tom; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie stop work was posted on job
|
ELE05-01631
| Electrical Rough-In | 1/30/2006 | 1/30/2006 | 1/30/2006 3:06:11 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 1/30/2006 at 9:53:57 AM. Contact: ###-####. 3rd and 6th floor elevator lobbies. anop walls ok
|
ELE05-01369
| Final | 1/26/2006 | 1/30/2006 | 1/30/2006 2:25:05 PM | P | FAIL |
|
|
Charlie; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Required recep in basement and attic with heating equipment.
|
ELE06-00262
| Rough-In Permanent Service | 1/30/2006 | 1/30/2006 | 1/30/2006 1:59:32 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: William Zerfas R/I Ok P/S U/G N Ok
|
ELE05-03316
| Final | 1/30/2006 | 1/30/2006 | 1/30/2006 1:58:50 PM | P | NR |
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Garage not finished
|
ELE05-03891
| Final | 1/30/2006 | 1/30/2006 | 1/30/2006 1:17:18 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: William Zerfas no card
|
ELE05-04074
| Conference | 1/30/2006 | 1/30/2006 | 1/30/2006 12:39:39 PM | P | PASS |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa talked about r/i requirements
|
ELE05-04585
| Permanent Service | 1/30/2006 | 1/30/2006 | 1/30/2006 10:27:35 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/30/2006 at 7:14:02 AM. Contact: ###-####. P/S U/G N Ok
|
ELE06-00326
| Temporary Service | 1/28/2006 | 1/30/2006 | 1/30/2006 9:50:18 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Therrin Robertson only one netural conductor per terminal connect neutral to neutral bus.
|
ELE06-00327
| Final | 1/28/2006 | 1/30/2006 | 1/30/2006 9:48:09 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Therrin Robertson connect GEC to neutral bus
|
ELE06-00328
| Final | 1/28/2006 | 1/30/2006 | 1/30/2006 9:47:24 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Therrin Robertson
|
ELE06-00091
| Electrical Rough-In | 1/28/2006 | 1/30/2006 | 1/30/2006 9:11:29 AM | A | FAIL |
|
|
I need rough in on upper floor and service panels only.; Phone #: ###-#### Internet Inspection Request from: steve creswell
Concrete-Encased Electrode. 314.17 electrode entering the panel. 210.52 required recep in bedroom by door. 6 in free conductor
|
ELE06-00328
| Temporary Service | 1/30/2006 | 1/30/2006 | 1/30/2006 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Therrin Robertson T/S U/G Ok
|