Inspections for the day of: Monday, January 30, 2006.
Number of inspections: 7
Percentage of inspections complete: 86 %
Percentage of inspections not complete: 14 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00490 INSP-Sprinkler Rough-in/Hydro1/23/20061/23/2006 A 
Check for completion.
FIR05-00677 INSP-Final Inspection1/30/20061/30/20061/30/2006 4:35:32 PMPPASS
Fire alarm permit finaled.
BLD04-00947 FIRE-Sprinkler Rough-in1/30/20061/30/20061/30/2006 4:33:45 PMPPART
Inspection for cold cavity protection of the fire sprinkler lines on the remaining third floor unit of this building is acceptable for cover.
FIR05-00677 INSP-Alarm Testing1/27/20061/30/20061/30/2006 4:29:05 PMAPASS
Fire alarm tested satisfactory, faulty pull station repaired while on site, egress controlled door tested satisfactory, need to provide a sign at the FACP room door.
BLD05-02179 FIRE-Final Inspection1/27/20061/30/20061/30/2006 3:09:26 PMAPASS
Fire life safety inspection passed.
BLD05-02334 FIRE-Final Inspection1/30/20061/30/20061/30/2006 10:02:05 AMAPART
Temporary occupancy approval granted per S. Rogers.
FIR05-00712 INSP-Final Inspection1/30/20061/30/20061/30/2006 10:00:04 AMAPART
Temporary occupancy approval for phase one related work of this permit granted per S. Rogers.