Inspections for the day of: Monday, January 30, 2006.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-02408 BLD-Framing/Rough-in1/30/20061/30/20061/30/2006 5:01:18 PMPFAIL
John; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Needs to sheet rock around canlight at vestibule. Bloow patches to be connected back to framimg member. Fire caulk around penetrations.
BLD05-02210 BLD-Final1/30/20061/30/20061/30/2006 3:38:34 PMPNR
Scheduled by a contractor via Hello! on 1/30/2006 at 7:24:56 AM. Contact: ###-####. Needs plumbing final.
BLD05-02611 BLD-Framing/Rough-in1/30/20061/30/20061/30/2006 3:36:17 PMPFAIL
Phone #: ###-#### Internet Inspection Request from: Stephen Renberg. Provide hangars on remaining trusses in garage at 427 side. Truss membrane penetration at 1hr wall not allowed, not as per plan. 5/8 type X gyp is required behind tubs and concealled space. Also provide wall assemblly for correct attachement of type x.
BLD05-01833 BLD-Energy code compliance1/30/20061/30/20061/30/2006 2:30:11 PMPFAIL
Brian; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Complete lateral bracing, header required over opening at C1 truss bearing, justify girder truss support were hangar was deleted. L brace gable end.
BLD05-01835 BLD-Energy code compliance1/30/20061/30/20061/30/2006 2:28:19 PMPFAIL
Brian; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Lateral bracing not complete. Header required over opening at C1 truss bearing. Justify girder support were hangar was deleted. L brace gable end.
BLD05-01560 BLD-Framing/Rough-in1/30/20061/30/20061/30/2006 2:22:03 PMPPASS
Casey; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Needs to complete the air seal package prior to insulating.
BLD05-02621 BLD-Framing/Rough-in1/27/20061/30/20061/30/2006 10:33:00 AMANR
Chris -- for resinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All items on c/n not complete.
BLD05-01335 BLD-Final1/27/20061/30/20061/30/2006 10:26:30 AMAPASS
Ben -- call 1st for access; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD05-03050 BLD-Other1/29/20061/30/20061/30/2006 10:06:33 AMPPASS
Scheduled by a contractor via Hello! on 1/29/2006 at 8:23:31 PM. Contact: ###-####. ok to cover pending mech and elec insp.
BLD05-02089 BLD-Footing1/27/20061/30/20061/30/2006 9:44:36 AMAPART
Scheduled by a contractor via Hello! on 1/27/2006 at 3:23:37 PM. Contact: ###-####. east and south footings.
BLD05-00962 BLD-Final1/28/20061/30/20061/30/2006 9:15:35 AMAPASS
Internet Inspection Request from: Carey Allen
BLD05-01947 BLD-Final1/28/20061/30/20061/30/2006 9:05:16 AMAFAIL
Internet Inspection Request from: Carey Allen. Complete grading, does not have 24 inches from footing to finish grade.
BLD05-00962 DOC - Permit Finaled1/30/20061/30/20061/30/2006 12:00:00 AMPPASS
BLD05-01335 DOC - Permit Finaled1/30/20061/30/20061/30/2006 12:00:00 AMPPASS
BLD05-03379 BLD-Footing1/30/20061/30/20061/30/2006 12:00:00 AMPPASS
Reinforcement installed. footing and stemwall placed at same time.