FIR06-00438
| FIR-Aging Inspection | 1/30/2007 | 1/30/2007 | 2/5/2007 12:03:12 PM | | DONE |
|
|
Work on site is still in progress at this time.
|
FIR05-00737
| INSP-Final Inspection | 1/29/2007 | 1/30/2007 | 1/31/2007 8:26:53 AM | P | PASS |
|
|
Retest of the fire alarm system passed inspection, permit finaled.
|
FIR05-00425
| INSP-Sprinkler Rough-in/Hydro | 1/29/2007 | 1/30/2007 | 1/30/2007 3:46:25 PM | A | PART |
|
|
OH hydrostatic test for the 4th floor dry system passed inspection.
|
FIR06-00644
| INSP-Final Inspection | 1/30/2007 | 1/30/2007 | 1/30/2007 3:41:13 PM | P | PASS |
|
|
Hood permit finaled.
|
FIR06-01011
| INSP-Final Inspection | 1/30/2007 | 1/30/2007 | 1/30/2007 3:40:51 PM | P | PASS |
|
|
Hood suppression fire alarm interconnection passed inspection, permit finaled.
|
FIR06-00907
| INSP-Final Inspection | 1/23/2007 | 1/30/2007 | 1/30/2007 3:06:28 PM | P | DEFR |
|
|
Phone #: ###-####
|
FIR06-00644
| INSP-Alarm Testing | 1/30/2007 | 1/30/2007 | 1/30/2007 3:05:51 PM | P | PASS |
|
|
Corrections verified, the hood suppression system operated correctly under test conditions.
|
FIR06-00476
| INSP-Final Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 2:24:11 PM | P | NR |
|
|
Contact is James @ ###-####. Thanks Phone #: ###-#### Contractor is not ready per phone call, pending UG flush.
|
FIR06-00294
| INSP-Final Inspection | 1/30/2007 | 1/30/2007 | 1/30/2007 12:46:06 PM | P | NR |
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIR06-00352
| INSP-Final Inspection | 1/30/2007 | 1/30/2007 | 1/30/2007 12:45:48 PM | P | NR |
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIR06-00449
| INSP-Final Inspection | 1/30/2007 | 1/30/2007 | 1/30/2007 12:45:29 PM | P | FAIL |
|
|
Provide forward flow test, certify RP backflow device, ball drip on the FDC is not installed correctly, missing head wrench.
|
FIR06-00145
| FIR-Aging Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 12:34:14 PM | A | PEND |
|
|
Vacant building, empty shell condition, no field inspection requests per contractor to date.
|
FIR06-00434
| FIR-Aging Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 12:28:58 PM | A | DONE |
|
|
Final pending satisfactory alarm supervision testing.
|
FIR06-00238
| FIR-Aging Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 12:28:18 PM | A | PASS |
|
|
The UG fire supply line permit work is complete and ready for final.
|
FIR06-00550
| INSP-Supply line flush | 1/30/2007 | 1/30/2007 | 1/30/2007 12:22:14 PM | P | PART |
|
|
UG supply line flush completed okay.
|
BLD04-02464
| FIRE-Final Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 12:08:45 PM | A | FAIL |
|
|
The project related fire sprinkler permit must be approved for final prior to building life safety final.
|
FIR06-00946
| INSP-Final Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 11:52:37 AM | A | PART |
|
|
The three tampers tested okay, still need to test the flow switch as a sprinkler rep. was not available to locate the remote inspectors test connection.
|
FIR06-00999
| INSP-Final Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 11:49:44 AM | A | PASS |
|
|
Fire alarm work is satisfactory, inspection passed. Note: NFPA 72 record of completion not available on site for signature, agreed to be delivered to the office for singing.
|
BLD05-01077
| FIRE-Final Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 9:58:58 AM | A | DEFR |
|
|
Rescheduled per conversation with contractor.
|
FIR07-00004
| INSP-Sprinkler Rough-in/Hydro | 1/29/2007 | 1/30/2007 | 1/30/2007 9:47:03 AM | A | PART |
|
|
Required corrections have been verified, OH rough-in approved for cover.
|
FIR05-00425
| INSP-Sprinkler Rough-in | 1/29/2007 | 1/30/2007 | 1/29/2007 10:42:48 AM | A | CANC |
|
|
Contact: Chris
Hydro - Mechanical Room Phone #: ###-#### Inspection cancelled from web by: Alicia Pauley
|
FIR05-00425
| INSP-Sprinkler Rough-in/Hydro | 1/29/2007 | 1/30/2007 | 1/29/2007 10:42:41 AM | A | CANC |
|
|
Contact: Chris
Hydro 4th floor Phone #: ###-#### Inspection cancelled from web by: Alicia Pauley
|