Inspections for the day of: Tuesday, January 30, 2007.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-03073 BLD-Other1/30/20071/30/20071/31/2007 7:39:09 AMPPASS
life safety finaled
FIR06-00806 FIR-Aging Inspection1/30/20071/30/20071/30/2007 3:27:17 PM NR
work is in progress
FIR06-00755 INSP-Sprinkler Rough-in/Hydro1/30/20071/30/20071/30/2007 3:24:30 PMPCANC
Per Terry the test is not ready today because the test pump had a malfunction.
FIR07-00062 INSP-Final Inspection1/30/20071/30/20071/30/2007 2:51:53 PMPPASS
permit finaled
FIR05-00644 INSP-Sprinkler Rough-in/Hydro1/29/20071/30/20071/30/2007 2:18:40 PMAPASS
The standpipe hydro test passed. Started the 24 hour air tests on both dry systems at 9:30. The 4th floor is at 45psi and the front system is at 47psi.
FIR06-00592 INSP-Final Inspection1/29/20071/30/20071/30/2007 1:24:17 PMPFAIL
No actual inspection was performed. I went through notification devices. Some need to be at a higher candella. The NAC panel has been relocated to the second floor. The smoke detector at this NAC needs relocated to the roof deck. As builts are required at the time of the next inspection. There appears to be a access controlled egress system at the doors which will need to be addressed.
BLD05-02149 FIRE-Final Inspection1/30/20071/30/20071/30/2007 11:44:31 AMPPASS
life safety finaled
FIR06-00591 INSP-Sprinkler Rough-in/Hydro1/29/20071/30/20071/30/2007 11:01:45 AMAPART
Hydro test was not ready. Rooms with ceilings are ok to cover
FIR06-00955 INSP-Sprinkler Rough-in1/29/20071/30/20071/30/2007 9:56:37 AMAPASS
Underground piping is ok to cover