ESC08-00924
| Conference | 1/23/2009 | 1/30/2009 | 1/30/2009 1:16:24 PM | A | DONE |
|
|
9:00 a.m.. Met with Boise City P. Works and Parks reps. Also, with B. & Caldwell and Sommer Construction. Reviewed area and discussed procedures needed to stabilize the site including time frames per CGP. Stabilization including soil binders and re-vegetation. Dewatering controls still in place because controls may still be needed for additional water transfer and treatment. Min. amount of reveg in wetlands area.
|