BLD08-02580
| FIRE-Final Inspection | 1/29/2009 | 1/30/2009 | 1/30/2009 3:44:14 PM | A | FAIL |
|
|
This inspection was just for the cooler which is fine. I went over other requirements for phase I sign off which includes approved hardware on the office doors and the back exit door, location of fire extinguishers and exit sign/emergency light locations.
|
BLD07-01941
| FIRE-Final Inspection | 1/30/2009 | 1/30/2009 | 1/30/2009 1:27:26 PM | P | PASS |
|
|
Life safety passed.
|
BLD07-01941
| FIRE-Final Inspection | 1/29/2009 | 1/30/2009 | 1/30/2009 12:59:53 PM | A | PASS |
|
|
Life safety passed. The builder lowered the rack shelving to provide the 24" minimum clearance.
|
BLD08-01299
| FIRE-Final Inspection | 1/30/2009 | 1/30/2009 | 1/30/2009 12:51:45 PM | P | PASS |
|
|
life safety passed.
|
BLD08-00684
| FIRE-Final Inspection | 1/30/2009 | 1/30/2009 | 1/30/2009 12:51:10 PM | P | PASS |
|
|
LIfe safety passed
|
BLD09-00090
| FIRE-Final Inspection | 1/29/2009 | 1/30/2009 | 1/30/2009 12:49:21 PM | A | PART |
|
|
A temporary occupancy was given. Provide approved hardware for the exit door which includes removing the thumbturn lock and the round knob. Also provide the annual inspection for the fire extinguisher.
|
FIR08-00810
| INSP-Final Inspection | 1/29/2009 | 1/30/2009 | 1/30/2009 10:14:59 AM | A | FAIL |
|
|
The city approved plans do not reflect the actual installation. Instead of one new point there are two and a supervisory signal from the vesda is connected directly to the wireless dialer which is not allowed. Provide as-builts and wire the panels correctly.
|
FIR07-01032
| INSP-Sprinkler Rough-in/Hydro | 1/29/2009 | 1/30/2009 | 1/30/2009 10:12:07 AM | A | PASS |
|
|
The hydro test for the second floor skilled nurse dining area passed.
|