FIR15-00036
| INSP-Sprinkler Rough-in/Hydro | 1/30/2015 | 1/30/2015 | 1/30/2015 5:12:47 PM | P | PART |
|
|
UG fire supply line hydrostatic test completed. Preliminary inspection of the overhead piping also finished.
|
FIR14-00430
| INSP-Sprinkler Rough-in | 1/30/2015 | 1/30/2015 | 1/30/2015 4:20:24 PM | A | PART |
|
|
|
BLD15-00112
| FIRE-Final Inspection | 1/29/2015 | 1/30/2015 | 1/30/2015 4:18:16 PM | P | PASS |
|
|
Life safety inspection passed.
|
FIR14-00900
| INSP-Sprinkler Rough-in | 1/30/2015 | 1/30/2015 | 1/30/2015 3:11:07 PM | P | FAIL |
|
|
Missing hangers at the 21/2" main and 2" main per plan, noted a leak at the NW corner branchline/main fit tee.
|
FIR14-00925
| INSP-Sprinkler Rough-in | 1/29/2015 | 1/30/2015 | 1/30/2015 1:33:45 PM | P | PART |
|
|
Okay to cover overhead work at the grid ceilings in the tenant remodel areas. Pendent head at the IT room to be located per plan at the centerline of the adjacent column.
|
FIR14-00851
| INSP-Final Inspection | 1/29/2015 | 1/30/2015 | 1/30/2015 11:38:04 AM | A | PASS |
|
|
Fire alarm permit finaled.
|
FIR14-00814
| INSP-Supply line flush | 1/29/2015 | 1/30/2015 | 1/30/2015 11:36:27 AM | A | PART |
|
|
UG fire supply line flush completed satisfactory.
|