FIR16-00718
| INSP-Final Inspection | 1/30/2017 | 1/30/2017 | 1/30/2017 2:10:17 PM | P | PASS |
|
|
permit finaled
|
BLD16-00390
| FIRE-Final Inspection | 1/30/2017 | 1/30/2017 | 1/30/2017 1:06:48 PM | P | PASS |
|
|
life safety passed
|
FIR16-00803
| INSP-Sprinkler Rough-in | 1/27/2017 | 1/30/2017 | 1/30/2017 11:47:27 AM | A | PART |
|
|
The latest approved plans need to be on site that show the actual project details, retaining straps need to be installed, hangers that are installed need to actually support the pipe, additional coverage is needed at the east end of the new offices. Piping is ok to cover.
|
FIR16-00813
| INSP-Sprinkler Rough-in | 1/27/2017 | 1/30/2017 | 1/30/2017 10:41:39 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
|
FIR16-00798
| INSP-Sprinkler Rough-in | 1/27/2017 | 1/30/2017 | 1/30/2017 8:18:37 AM | A | PASS |
|
|
Remaining piping in the Conference Room is ok to cover.
|
FIR17-00044
| INSP-Sprinkler Rough-in | 1/27/2017 | 1/30/2017 | 1/30/2017 8:18:05 AM | A | PASS |
|
|
Permit finaled
|