Inspections for the day of: Monday, January 30, 2017.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01545 Site Preparation1/30/20171/30/20172/1/2017 3:56:25 PMPPASS
clint Phone #: ###-####
Sign posted and visible. Subdivision BMPs in place. DI bags look good.
Correction: Concrete washout is nearly full. Called RP (Clint) and left a message with him to get the concrete washout scheduled for maintenance.
ESC15-01368 Aging Inspection1/30/20171/30/20172/1/2017 10:29:40 AM PASS
Building finaled. Snow covered conditions. Soil does not appear to be stabilized yet. No corrections.
ESC16-00361 General Inspection1/30/20171/30/20172/1/2017 9:47:38 AM PASS
Building finaled. Vegetation mature. Soil stabilized. No trackout or trash left. Okay to final
ESC16-00224 Aging Inspection1/30/20171/30/20171/31/2017 2:34:09 PM PASS
Appears to be finished. No soil has been disturbed. Snow covered conditions. Okay.
ESC16-01560 Site Preparation1/27/20171/30/20171/31/2017 2:10:37 PMPPASS
Next utility dewatering.
Sheet flowing water into section of site surrounded by berms. Containing the water adequately. Some small spill overs. Talked with (RP) Bruce he has been keeping an eye on the overflow and fixing berm as needed. In event of overflow due to predicted rain event Bruce plans to pump clean water into swales/pond.

Requested cleaning the sidewalk near Parkcenter, checking DI bags on Parkcenter, and keeping ice off of green belt.
ESC16-00712 Site Final1/30/20171/30/20171/31/2017 1:11:39 PMPCANC
ESC16-01598 Site Preparation1/30/20171/30/20171/31/2017 12:55:06 PMPPASS
Phone #: ###-#### Inspection requested via web by Braxton Hansen

Sign posted and visible. Dirt berm around site protecting erosion to surrounding areas. No track out. DI bag inserted down the street. DI bag about ΒΌ full continue to monitor to ensure it does not get clogged. No corrections at this time.
ESC16-00659 General Inspection1/30/20171/30/20171/31/2017 9:05:59 AM PASS
Building is finished. No WIP. Final stabilization not installed yet. Snow covered conditions preventing vegetation installation. No trackout. Ensure sidewalk is swept and vegetation is installed before finaling
ESC16-00712 DOC - Permit Finaled1/30/20171/30/20171/30/2017 4:27:06 PMPPASS
Okay to final.
ESC16-01368 BMP Violation1/30/20171/30/20171/30/2017 4:18:53 PMPPEND
Dirt is stockpiled around up to and on sidewalks. Talked with foreman at site and asked to place BMP controls around the stockpiles/site to prevent run off. Called RP (Dan French) and requested BMP controls around stockpiles/site and moving stockpiles back from sidewalks. Says he will do so this week. Will check back at the end of this week to assure compliance. Sign is posted.
ESC16-00397 Aging Inspection1/30/20171/30/20171/30/2017 3:13:47 PM PEND
No WIP. Just foundations and driveways. Snow covered conditions. No signs of disturbance.
ESC15-01184 General Inspection1/30/20171/30/20171/30/2017 2:56:14 PM PASS

WIP on interior and exterior of building. No track out. DI bags look ok. Some areas still snow covered. Some trash around site.