ELE16-04017
| Final | 1/29/2018 | 1/30/2018 | 1/30/2018 2:49:08 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Debby Pierce Pay stations in stair towers not set yet. 300.15- All wiring shall terminate in a box.
|
ELE17-01337
| Electrical Rough-In | 1/30/2018 | 1/30/2018 | 1/30/2018 1:41:55 PM | P | PASS |
|
|
We are requesting a ceiling rough-in inspection for the elevator room for this afternoon. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Elevator room hardlid rough in ok cover
|
ELE18-00341
| Final | 1/29/2018 | 1/30/2018 | 1/30/2018 12:14:09 PM | A | FAIL |
|
|
Please contact Larren Novak for access Phone #: ###-#### Inspection requested via web by steve ragan Receptacles installed for servers in ceiling of 2 different rooms. Receptacles also added for computer stations. Wiring for cubicals not in yet. 400.14- Receptacles located in ceiling for servers shall be located so pull at joints or terminals is eliminated. Receptacles located 5 to 6' off to side of equipment served. 605.9- Surge suppression plug strips shall be 12 guage min and max of 2' in length. Called to attach to BLD17-04188
|
ELE18-00364
| Electrical Rough-In | 1/29/2018 | 1/30/2018 | 1/30/2018 11:06:05 AM | A | PASS |
|
|
CONTACT NAME JEREMY THORNOCK Phone #: ###-#### Inspection requested via web by Deb Gooden Due to date plan submitted 8-8-17 for review falling in grace period, 210.71 will not be enforced for conference room. Break room, copy room, and offices only wall rough in ok cover.
|