Inspections for the day of: Tuesday, January 30, 2018.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-04017 Final1/29/20181/30/20181/30/2018 2:49:08 PMPFAIL
Phone #: ###-#### Inspection requested via web by Debby Pierce
Pay stations in stair towers not set yet.
300.15- All wiring shall terminate in a box.
ELE17-01337 Electrical Rough-In1/30/20181/30/20181/30/2018 1:41:55 PMPPASS
We are requesting a ceiling rough-in inspection for the elevator room for this afternoon. Our contact is Rick @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Elevator room hardlid rough in ok cover
ELE18-00341 Final1/29/20181/30/20181/30/2018 12:14:09 PMAFAIL
Please contact Larren Novak for access Phone #: ###-#### Inspection requested via web by steve ragan
Receptacles installed for servers in ceiling of 2 different rooms. Receptacles also added for computer stations. Wiring for cubicals not in yet.
400.14- Receptacles located in ceiling for servers shall be located so pull at joints or terminals is eliminated. Receptacles located 5 to 6' off to side of equipment served.
605.9- Surge suppression plug strips shall be 12 guage min and max of 2' in length.
Called to attach to BLD17-04188
ELE18-00364 Electrical Rough-In1/29/20181/30/20181/30/2018 11:06:05 AMAPASS
CONTACT NAME JEREMY THORNOCK Phone #: ###-#### Inspection requested via web by Deb Gooden
Due to date plan submitted 8-8-17 for review falling in grace period, 210.71 will not be enforced for conference room.
Break room, copy room, and offices only wall rough in ok cover.