MEC17-05679
| Final | 1/30/2018 | 1/30/2018 | 1/30/2018 4:23:23 PM | P | PASS |
|
|
call Sandy on way- ###-####- furnace CO ok
|
MEC18-00039
| Rough-in | 1/29/2018 | 1/30/2018 | 1/30/2018 3:51:55 PM | P | PASS |
|
|
If you Could Call Vance when you arrive that would be great..Thank you! Phone #: ###-#### Inspection requested via web by Devony Bullard- R/I ok
|
MEC18-00039
| Pressure Test | 1/29/2018 | 1/30/2018 | 1/30/2018 3:51:33 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pass
|
MEC18-00233
| Rough-in | 1/29/2018 | 1/30/2018 | 1/30/2018 3:51:08 PM | P | PASS |
|
|
If you could call Vance when you arrive that would be great thank you! Phone #: ###-#### Inspection requested via web by Devony Bullard- R/I ok
|
MEC18-00233
| Pressure Test | 1/29/2018 | 1/30/2018 | 1/30/2018 3:50:48 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pass
|
MEC18-00287
| Conference | 1/29/2018 | 1/30/2018 | 1/30/2018 3:30:54 PM | P | PASS |
|
|
witness d blast 2:15 pm Phone #: ###-#### Inspection requested via web by dannyel chaloupka- duct blast test pass
|
MEC18-00216
| Pressure Test | 1/30/2018 | 1/30/2018 | 1/30/2018 3:09:54 PM | P | PASS |
|
|
Gas line is outside back left corner Phone #: ###-#### Inspection requested via web by Andrea Creek- 20lb gas pass from meter to shop underground- ok to backfill- need 1" clearance on b vent in garage by final
|
MEC17-05565
| Rough-in | 1/30/2018 | 1/30/2018 | 1/30/2018 2:50:15 PM | P | PASS |
|
|
THANK YOU Phone #: ###-#### Inspection requested via web by Aaron Alandt- Rough in ok
|
MEC17-05565
| Pressure Test | 1/30/2018 | 1/30/2018 | 1/30/2018 2:49:44 PM | P | PASS |
|
|
THANK YOU Phone #: ###-#### Inspection requested via web by Aaron Alandt- 20lb gas pass
|
MEC18-00246
| Rough-in | 1/30/2018 | 1/30/2018 | 1/30/2018 1:52:37 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- fresh air needs to be ran in 6" round pipe per manual J and insulated in attic and garage- missing 14x4 transfer opening master bedroom first floor- need all framing completed in closet 2nd floor, laundry room and garage- left correction notice front window
|
MEC18-00246
| Pressure Test | 1/30/2018 | 1/30/2018 | 1/30/2018 1:49:04 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by dannyel chaloupka- 20lb gas pass
|
MEC18-00246
| Conference | 1/29/2018 | 1/30/2018 | 1/30/2018 1:48:26 PM | P | PASS |
|
|
witness d blast 115 pm Phone #: ###-#### Inspection requested via web by dannyel chaloupka- duct blast test pass
|
MEC18-00438
| Final | 1/29/2018 | 1/30/2018 | 1/30/2018 1:20:04 PM | P | PASS |
|
|
FINAL INSPECTION FOR 95% CARRIER COMFORT SERIES FURNACE. PLEASE GO LATER IN THE AFTERNOON IF POSSIBLE ; CALL (APPRENTICE) JAMIE AT THE # LISTED WHEN EN ROUTE. Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING- 5lb flue pass- Furnace CO ok
|
MEC17-05701
| Conference | 1/29/2018 | 1/30/2018 | 1/30/2018 12:10:54 PM | P | CANC |
|
|
witness d blast 12 pm Phone #: ###-#### Inspection requested via web by dannyel chaloupka- need to reschedule sheetrock over registers
|
MEC17-05536
| Final | 1/30/2018 | 1/30/2018 | 1/30/2018 11:28:00 AM | A | PASS |
|
|
Balance report has been emailed. That should be it on mechanical side. Phone #: ###-#### Inspection requested via web by Drew Tverdy- final ok- air balance report all good
|
MEC17-05179
| Pressure Test | 1/29/2018 | 1/30/2018 | 1/30/2018 11:27:16 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pass
|
MEC17-05177
| Pressure Test | 1/29/2018 | 1/30/2018 | 1/30/2018 11:26:46 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Devony Bullard- 20lb gas pass
|
MEC18-00421
| Final | 1/29/2018 | 1/30/2018 | 1/30/2018 11:03:13 AM | A | PASS |
|
|
Call me when your on your way and I will meet you there. Thank you Phone #: ###-#### Inspection requested via web by Jason Baxter- electric furnace AC ok
|
MEC17-04965
| Conference | 1/30/2018 | 1/30/2018 | 1/30/2018 10:31:26 AM | P | CANC |
|
|
This has passed. Please let me know what I need to do so I can close this. Thank you, Susie Inspection requested via web by Andrea Grigsby- need to schedule final inspection per phone call with Susie
|
MEC17-05244
| Rough-in | 1/29/2018 | 1/30/2018 | 1/30/2018 10:25:01 AM | A | PASS |
|
|
LasikPlus TI - Ceiling cover inspection requested. Job lead is Chris Jacobson ###-#### Phone #: ###-#### Inspection requested via web by Jess Wigley- R/I ok- duct sealing and flex to registers ok- ok for ceiling tiles-
|
MEC17-04240
| Final | 1/29/2018 | 1/30/2018 | 1/30/2018 9:49:30 AM | A | FAIL |
|
|
mike Phone #: ###-####- need to insulate RA in garage- need secondary drains ran out on both units- need uv protection on linsets outs both units- cant final,out permit til other mechanical issues are resolved with builder- need to add 1 AC and 1 furnace to permit
|
MEC17-05679
| Pressure Test | 1/26/2018 | 1/30/2018 | 1/30/2018 9:00:54 AM | A | CANC |
|
|
Please call technician Kirk when heading to job site, ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Stephanie Phillippi- not needed unconditioned space per phone call from contractor
|
MEC18-00352
| Final | 1/26/2018 | 1/30/2018 | 1/30/2018 8:46:23 AM | A | CANC |
|
|
please call Matt Krebbs the owner when 30 mins in route- If rough in passes we are also requesting final inspection for same date/time Phone #: ###-#### Inspection requested via web by Rick Montgomery- see rough in notes
|
MEC18-00352
| Rough-in | 1/26/2018 | 1/30/2018 | 1/30/2018 8:46:00 AM | A | CANC |
|
|
please call Matt Krebbs the owner when 30 mins in route- If rough in passes we are also requesting final inspection for same date/time Phone #: ###-#### Inspection requested via web by Rick Montgomery- building permit is under review- can not do inspection with issued permit and approved drawings onsite- talked with Steve about this
|
MEC18-00246
| Rough-in | 1/29/2018 | 1/30/2018 | 1/30/2018 8:34:14 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by dannyel chaloupka Inspection cancelled from web by: dannyel chaloupka
|
MEC18-00246
| Pressure Test | 1/29/2018 | 1/30/2018 | 1/30/2018 8:34:11 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by dannyel chaloupka Inspection cancelled from web by: dannyel chaloupka
|
MEC18-00443
| Rough-in | 1/30/2018 | 1/30/2018 | 1/30/2018 8:34:10 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by claude croy- need approved ACCCA report onsite to do inspection- b vent insulation shield needs 1" clearance to pipe
|
MEC18-00443
| Pressure Test | 1/30/2018 | 1/30/2018 | 1/30/2018 8:33:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by claude croy- 20lb gas pass
|
MEC17-02485
| Mec-Aging Inspection | 1/30/2018 | 1/30/2018 | 1/30/2018 8:29:08 AM | | PEND |
|
|
contractor will schedule final per phone call
|
MEC17-04666
| Final | 1/26/2018 | 1/30/2018 | 1/30/2018 8:22:36 AM | A | FAIL |
|
|
0704- code. Manual J is onsite in red folder. Phone #: ###-#### Inspection requested via web by Angie Thome- range hood still needs installed and hooked up- need uv protection on lineset at AC outside
|
MEC17-04640
| Rough-in | 1/29/2018 | 1/30/2018 | 1/30/2018 8:21:51 AM | A | FAIL |
|
|
MICHAEL ###-#### Phone #: ###-#### Inspection requested via web by Jason Robinson- need to remove sheetrock to do inspection- i posted a do not cover sticker on fireplace now is sheetrocked in- need to open up and see if ok
|
MEC17-05824
| Final | 1/29/2018 | 1/30/2018 | 1/29/2018 3:07:41 PM | A | PASS |
|
|
Matt Benton Phone #: ###-####- inspection done on 1-29-18- card signed
|