ELE16-03912
| ELE-Request for Extension | 1/29/2019 | 1/30/2019 | 1/30/2019 1:39:54 PM | P | PASS |
|
|
This inspection is for an extension to the permit. I have not completed the project, but it is moving forward. If you would like to come in to see the progress, please call me at ###-#### and give me about 15 minutes to rush home from work to let you in. Thanks! Phone #: ###-#### Inspection requested via web by Joshua Fusselman 180 days extension given
|
ELE19-00384
| Final | 1/30/2019 | 1/30/2019 | 1/30/2019 1:10:23 PM | P | PASS |
|
|
Homeowner only has access to burned side fire damage call ahead // Cathy Phone #: ###-#### Service grandfathered in at time of install, No damage directly to panel and meter and ok to re-energize at this time p/s o/h rec ok
|
ELE18-04152
| Final | 1/30/2019 | 1/30/2019 | 1/30/2019 12:41:20 PM | P | PASS |
|
|
garage code 1234 enter----note inspection is on the house in the FRONT Phone #: ###-#### Inspection requested via web by Charles Davis Final ok
|
ELE18-02854
| Permanent Service | 1/30/2019 | 1/30/2019 | 1/30/2019 12:40:29 PM | A | PASS |
|
|
Building H Service Inspection Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek p/s u/g n ok
|
ELE18-02853
| Permanent Service | 1/30/2019 | 1/30/2019 | 1/30/2019 12:40:04 PM | A | PASS |
|
|
Building E Service Inspection Contact Scott Wilson Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek p/s u/g n ok
|
ELE19-00374
| Electrical Rough-In | 1/29/2019 | 1/30/2019 | 1/30/2019 10:30:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI House Rough-in ok to cover
|
ELE18-02181
| Final | 1/29/2019 | 1/30/2019 | 1/30/2019 9:18:45 AM | A | PASS |
|
|
Re-inspect for final. Phone #: ###-#### Inspection requested via web by Bryan Atkins Occ card not on site Corrections fixed final ok
|
ELE19-00285
| Conference | 1/30/2019 | 1/30/2019 | 1/30/2019 9:12:50 AM | P | DONE |
|
|
Discussed the options of service change requirements over a hot tub. Tub is in-op at this time, option given of a structure over tub looks as if that is going to be the final correction. Owner will have it built i a timely manner.....
|