Inspections for the day of: Wednesday, January 30, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-03912 ELE-Request for Extension1/29/20191/30/20191/30/2019 1:39:54 PMPPASS
This inspection is for an extension to the permit. I have not completed the project, but it is moving forward. If you would like to come in to see the progress, please call me at ###-#### and give me about 15 minutes to rush home from work to let you in. Thanks! Phone #: ###-#### Inspection requested via web by Joshua Fusselman
180 days extension given
ELE19-00384 Final1/30/20191/30/20191/30/2019 1:10:23 PMPPASS
Homeowner only has access to burned side fire damage call ahead // Cathy Phone #: ###-####
Service grandfathered in at time of install, No damage directly to panel and meter and ok to re-energize at this time
p/s o/h rec ok
ELE18-04152 Final1/30/20191/30/20191/30/2019 12:41:20 PMPPASS
garage code 1234 enter----note inspection is on the house in the FRONT Phone #: ###-#### Inspection requested via web by Charles Davis
Final ok
ELE18-02854 Permanent Service1/30/20191/30/20191/30/2019 12:40:29 PMAPASS
Building H Service Inspection
Contact Scott Wilson
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek
p/s u/g n ok
ELE18-02853 Permanent Service1/30/20191/30/20191/30/2019 12:40:04 PMAPASS
Building E Service Inspection
Contact Scott Wilson
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek
p/s u/g n ok
ELE19-00374 Electrical Rough-In1/29/20191/30/20191/30/2019 10:30:32 AMAPASS
Phone #: ###-#### Inspection requested via web by TOM BICANDI
House Rough-in ok to cover
ELE18-02181 Final1/29/20191/30/20191/30/2019 9:18:45 AMAPASS
Re-inspect for final. Phone #: ###-#### Inspection requested via web by Bryan Atkins
Occ card not on site
Corrections fixed final ok
ELE19-00285 Conference1/30/20191/30/20191/30/2019 9:12:50 AMPDONE
Discussed the options of service change requirements over a hot tub. Tub is in-op at this time, option given of a structure over tub looks as if that is going to be the final correction. Owner will have it built i a timely manner.....