BLD18-03377
| BLD-Aging Inspection | 1/30/2020 | 1/30/2020 | 1/30/2020 4:15:28 PM | | PASS |
|
|
Expires: 03/16/20
|
BLD19-02318
| BLD-Framing/Rough-in | 1/29/2020 | 1/30/2020 | 1/30/2020 3:56:52 PM | P | PART |
|
|
Call 15 mins ahead- Mike Phone #: ###-#### need hvac/ ok to insulate upon hvac aproval.
|
BLD19-04504
| BLD-Framing/Rough-in | 1/29/2020 | 1/30/2020 | 1/30/2020 3:28:31 PM | P | PASS |
|
|
Inspection requested via web by Rob Ashworth nail fg1
|
BLD19-04507
| BLD-Energy code compliance | 1/29/2020 | 1/30/2020 | 1/30/2020 3:27:56 PM | P | PASS |
|
|
Inspection requested via web by Rob Ashworth
|
BLD19-02257
| BLD-Final | 1/30/2020 | 1/30/2020 | 1/30/2020 3:08:07 PM | P | PASS |
|
|
terri Phone #: ###-####
|
BLD06-02322
| BLD-Final | 1/30/2020 | 1/30/2020 | 1/30/2020 2:44:22 PM | P | PART |
|
|
lee Phone #: ###-####
|
BLD19-00527
| BLD-Other | 1/30/2020 | 1/30/2020 | 1/30/2020 1:46:50 PM | P | NR |
|
|
Exteror 2hr sheetrock on stair walls first layer inspection and conference on assemblies for ga file wp 4136 and UL des U344 Phone #: ###-#### Inspection requested via web by Travis Blackburn
|
BLD19-02895
| BLD-Final | 1/30/2020 | 1/30/2020 | 1/30/2020 1:24:49 PM | P | PASS |
|
|
Daniel Phone #: ###-####
|
BLD19-02895
| DOC - Permit Finaled | 1/30/2020 | 1/30/2020 | 1/30/2020 1:24:38 PM | P | PASS |
|
|
|
BLD19-04068
| BLD-Footing | 1/30/2020 | 1/30/2020 | 1/30/2020 1:10:11 PM | P | PASS |
|
|
Francis Phone #: ###-####
|
BLD19-04065
| BLD-Footing | 1/30/2020 | 1/30/2020 | 1/30/2020 1:09:54 PM | P | PASS |
|
|
Francis Phone #: ###-####
|
BLD19-04116
| BLD-Energy code compliance | 1/29/2020 | 1/30/2020 | 1/30/2020 10:55:50 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD19-02017
| BLD-Conference | 1/29/2020 | 1/30/2020 | 1/30/2020 10:29:43 AM | A | PASS |
|
|
Elton Phone #: ###-#### min 6 inches tread // 4 3/4 head height exception ok.
|
BLD19-03422
| BLD-Concrete | 1/27/2020 | 1/30/2020 | 1/30/2020 9:50:22 AM | A | PASS |
|
|
MTI is scheduled to inspect the rebar at 9:30 am followed by a 3 cy pour at 10 am. This pour is for the small SOG inside the building. Phone #: ###-#### Inspection requested via web by John Cloninger si on site pending reports.
|
BLD19-03898
| BLD-Ceiling Grid Inspection | 1/29/2020 | 1/30/2020 | 1/30/2020 9:49:38 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Nate Carriveau need mains supported max 8 inches both ends of mains/ ok to flood sm rooms and primtors ajsent to mains.
|