PLM96-00091
| INSP - Plumbing Rough-in | 1/31/1996 | 1/31/1996 | 2/1/1996 12:00:00 AM | P | FAIL |
|
|
01/31/96 323 - REINSPECTION corrections needed
|
PLM96-00097
| INSP - Plumbing Rough-in | 1/31/1996 | 1/31/1996 | 2/1/1996 12:00:00 AM | P | PASS |
|
|
01/31/96 323 - 12 FIXTURES rough-in ok
|
PLM96-00155
| INSP - Sewer and Water lines | 1/30/1996 | 1/31/1996 | 1/31/1996 12:00:00 AM | A | PASS |
|
|
01/30/96 323 - TEST WILL BE ON @ 8:00 OR 8:30 AT THE LATEST sewer and water final
|
PLM96-00157
| INSP - Plumbing Rough-in | 1/30/1996 | 1/31/1996 | 1/31/1996 12:00:00 AM | A | PASS |
|
|
01/30/96 323 - REINSPECTION 9 FIXTURES IN ALL ROUGH-IN OK
|
PLM95-01911
| INSP - Plumbing Rough-in | 1/30/1996 | 1/31/1996 | 1/31/1996 12:00:00 AM | A | FAIL |
|
|
01/30/96 323 - 5 FIXTURES--MOOCHO CORRECTIONS NEEDED
|
PLM95-01914
| INSP - Sewer line | 1/30/1996 | 1/31/1996 | 1/31/1996 12:00:00 AM | A | PART |
|
|
01/30/96 323 - sewer line test ok--c.o to be lowered
|
PLM96-00167
| INSP - Sprinkler & Backflow | 1/30/1996 | 1/31/1996 | 1/31/1996 12:00:00 AM | P | PASS |
|
|
01/30/96 323 - BACK OF BLDG AT CAR WASH//BEHIND MILLER STEPHAN OFF FRANK back flows final ok
|