ELE99-04500
| Final | 1/28/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/28/2000 at 14:04:13. Contact: ###-####.
|
ELE00-00315
| Electrical Rough-In | 1/28/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/28/2000 at 14:31:22. Contact: ###-####. p\s r\i ok 2/1/00 8:42:43 AM
|
ELE00-00164
| Electrical Rough-In | 1/31/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | PASS |
|
|
frank --###-#### r/i-call 1st before insp r\i ok 2/1/00 8:43:10 AM
|
ELE99-02877
| Final | 1/31/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | FAIL |
|
|
kelly ###-#### 250-148 mounting of receps induction gfci protection covers missing 2/1/00 8:43:44 AM
|
ELE00-00124
| Final | 1/31/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | PASS |
|
|
###-#### final ok 2/1/00 8:43:00 AM
|
ELE99-04348
| Electrical Rough-In | 1/27/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | PART |
|
|
Ed- ###-####. 2 and 1/2 outside walls r\i ok 2/1/00 8:44:09 AM
|