BLD99-03633
| BLD-Framing/Rough-in | 1/28/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/28/2000 at 17:03:59. Contact: . went over items with framer straps at garage nailed to wrong studs 1/31/00 1:18:50 PM
|
BLD99-03428
| BLD-Energy code compliance | 1/28/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | A | PASS |
|
|
Ed ###-####
|
BLD99-03699
| BLD-Foundation | 1/28/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | A | FAIL |
|
|
clay ###-#### 727585 foundation wall need three horizontals in wall per engineering 1/31/00 1:17:44 PM
|
BLD99-03698
| BLD-Foundation | 1/28/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | A | PASS |
|
|
###-#### walls 1/31/00 1:19:03 PM
|
BLD99-02073
| BLD-Final | 1/28/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | A | PASS |
|
|
Ron ###-####. approved wall blocked of hallway 1/31/00 1:19:31 PM
|
BLD99-03395
| BLD-Energy code compliance | 1/28/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | PASS |
|
|
Gary Green- ###-#### (cell). need to verify support of floor joist offset at final 2/1/00 8:45:19 AM
|
BLD99-03707
| BLD-Foundation | 1/31/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | FAIL |
|
|
###-#### no forms or work crew hole only 2/1/00 8:46:01 AM
|
BLD99-03474
| BLD-Other | 1/31/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 08:56:13. Contact: . holddowns ok
|
BLD99-03561
| BLD-Other | 1/31/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 08:57:07. Contact: . garage hold down not done check at frame 2/1/00 8:47:03 AM
|
BLD00-00092
| BLD-Foundation | 1/31/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | PART |
|
|
###-#### verify correct hold downs at shear insp 2/1/00 8:44:43 AM
|
MEC00-00261
| Rough-in | 1/31/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 09:11:40. Contact: ###-####. already done 2/1/00 8:45:40 AM
|
BLD99-02757
| BLD-Framing/Rough-in | 1/31/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | PASS |
|
|
###-#### frame made ok ok for rock 2/1/00 8:46:36 AM
|
BLD99-03161
| BLD-Footing | 1/31/2000 | 1/31/2000 | 1/31/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/31/2000 at 10:44:29. Contact: ###-####. setbacks soil appear ok 2/1/00 8:46:21 AM
|