Inspections for the day of: Wednesday, January 31, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02581 BLD-Framing/Rough-in1/30/20011/31/20011/31/2001 12:00:00 AMAPART
fr insp dave-- ###-#### or ###-#### restroom wall infill 1/31/2001 4:18:28 PM
BLD00-00514 BLD-Framing/Rough-in1/30/20011/31/20011/31/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/30/2001 at 15:23:51. Contact: ###-####. fireproofing at beams at gar entry ok pend report 1/31/2001 3:39:44 PM
BLD00-01086 BLD-Final1/30/20011/31/20011/31/2001 12:00:00 AMAFAIL
###-####, c/n, need eng's report for changes; beams, hd's & joists not per plan ...ok to insul rim & bsmt walls only. Partial, no trusses inspected. 1/31/2001 12:28:11 PM
BLD00-01903 BLD-Final1/30/20011/31/20011/31/2001 12:00:00 AMAPART
###-####, struct ok,need $500 bond for driveway; give l/c at office please. 1/31/2001 10:22:46 AM
BLD00-02996 BLD-Other1/29/20011/31/20011/31/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 01/29/2001 at 13:10:19. Contact: ###-####.called left msg, no response. unsure what needed?? 1/31/2001 3:06:23 PM
BLD00-02884 BLD-Footing1/30/20011/31/20011/31/2001 12:00:00 AMPPART
Jeff ###-####, PEND ENG'S LETTER/SOILS OK...LOOKS OK 1/31/2001 4:55:26 PM
BLD01-00008 BLD-Framing/Rough-in1/30/20011/31/20011/31/2001 12:00:00 AMPPART
Don Bryan, ###-#### int partions ok to cover. NEED HVAC. 1/31/2001 4:32:22 PM
BLD00-01563 BLD-Concrete1/29/20011/31/20011/31/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/29/2001 at 06:35:40. Contact: ###-####. pend spec insp report. 1/31/2001 12:40:52 PM
BLD00-02417 BLD-Framing/Rough-in1/31/20011/31/20011/31/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/31/2001 at 08:02:13. Contact: ###-####. c/n, air seal, landing framing, etc. trusses not per eng'g 1/31/2001 3:13:44 PM
BLD00-02413 BLD-Framing/Rough-in1/31/20011/31/20011/31/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 01/31/2001 at 08:03:13. Contact: ###-####. c/n no air seal, landing framing, ducts ,etc. 1/31/2001 3:14:24 PM
BLD00-00824 BLD-Framing/Rough-in1/31/20011/31/20011/31/2001 12:00:00 AMPPART
###-#### add wires, rivets & fireblocks at wall/ceiling. ok to cover 1/31/2001 3:38:57 PM
BLD00-00081 BLD-Framing/Rough-in1/31/20011/31/20011/31/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 01/31/2001 at 08:34:01. Contact: ###-####. part, clg at stairs ok to tile, need fasteners per ul detail at gyp face layer at stair walls2/1/2001 11:53:20 AM 2/1/2001 11:55:02 AM
BLD01-00129 BLD-Footing1/31/20011/31/20011/31/2001 12:00:00 AMPPART
###-####; poured 1/31/2001 1:56:08 PM
BLD01-00218 BLD-Energy code compliance1/31/20011/31/20011/31/2001 12:00:00 AMPPASS
###-####
BLD00-01806 BLD-Framing/Rough-in1/31/20011/31/20011/31/2001 12:00:00 AMPFAIL
Added by Inspector: 340 On 1/31/2001 4:49:44 PM C/N, NEED ENG'S REPORT FOR CHANGES; VERIFY HD'S W/ TONY? 1/31/2001 4:50:18 PM