BLD00-02581
| BLD-Framing/Rough-in | 1/30/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | A | PART |
|
|
fr insp dave-- ###-#### or ###-#### restroom wall infill 1/31/2001 4:18:28 PM
|
BLD00-00514
| BLD-Framing/Rough-in | 1/30/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/30/2001 at 15:23:51. Contact: ###-####. fireproofing at beams at gar entry ok pend report 1/31/2001 3:39:44 PM
|
BLD00-01086
| BLD-Final | 1/30/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | A | FAIL |
|
|
###-####, c/n, need eng's report for changes; beams, hd's & joists not per plan ...ok to insul rim & bsmt walls only. Partial, no trusses inspected. 1/31/2001 12:28:11 PM
|
BLD00-01903
| BLD-Final | 1/30/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | A | PART |
|
|
###-####, struct ok,need $500 bond for driveway; give l/c at office please. 1/31/2001 10:22:46 AM
|
BLD00-02996
| BLD-Other | 1/29/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 13:10:19. Contact: ###-####.called left msg, no response. unsure what needed?? 1/31/2001 3:06:23 PM
|
BLD00-02884
| BLD-Footing | 1/30/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | P | PART |
|
|
Jeff ###-####, PEND ENG'S LETTER/SOILS OK...LOOKS OK 1/31/2001 4:55:26 PM
|
BLD01-00008
| BLD-Framing/Rough-in | 1/30/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | P | PART |
|
|
Don Bryan, ###-#### int partions ok to cover. NEED HVAC. 1/31/2001 4:32:22 PM
|
BLD00-01563
| BLD-Concrete | 1/29/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 06:35:40. Contact: ###-####. pend spec insp report. 1/31/2001 12:40:52 PM
|
BLD00-02417
| BLD-Framing/Rough-in | 1/31/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/31/2001 at 08:02:13. Contact: ###-####. c/n, air seal, landing framing, etc. trusses not per eng'g 1/31/2001 3:13:44 PM
|
BLD00-02413
| BLD-Framing/Rough-in | 1/31/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/31/2001 at 08:03:13. Contact: ###-####. c/n no air seal, landing framing, ducts ,etc. 1/31/2001 3:14:24 PM
|
BLD00-00824
| BLD-Framing/Rough-in | 1/31/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | P | PART |
|
|
###-#### add wires, rivets & fireblocks at wall/ceiling. ok to cover 1/31/2001 3:38:57 PM
|
BLD00-00081
| BLD-Framing/Rough-in | 1/31/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/31/2001 at 08:34:01. Contact: ###-####. part, clg at stairs ok to tile, need fasteners per ul detail at gyp face layer at stair walls2/1/2001 11:53:20 AM 2/1/2001 11:55:02 AM
|
BLD01-00129
| BLD-Footing | 1/31/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | P | PART |
|
|
###-####; poured 1/31/2001 1:56:08 PM
|
BLD01-00218
| BLD-Energy code compliance | 1/31/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD00-01806
| BLD-Framing/Rough-in | 1/31/2001 | 1/31/2001 | 1/31/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 340 On 1/31/2001 4:49:44 PM C/N, NEED ENG'S REPORT FOR CHANGES; VERIFY HD'S W/ TONY? 1/31/2001 4:50:18 PM
|